|
Facilidade de uso
cart side panels, as shown in figure A and B. Attach the locking wheels (DJ) to the back of the bottom shelf (DI) and the regular wheels (DK) to the front of the bottom shelf (DI) . To secure the 4 wheels, hand tighten fi rst. Then, tighten further using the wrench provided in the hardware pack. YOU WILL NEED: 10 Back view YOU WILL NEED: X 1 3 Back view 6 8 7 A B X 6 X 6X 6 Close up Ensure that the wheels are firmly locked in the “ON” position before continuing. Assemble the left side panel (DE) and the right side panel (DF) to the bottom shelf (DI). YOU WILL NEED: 1 5 4 X 6 X 6 X 6 Front view DK DJ DI DE DF DI 2 4 DF DG DE Attach the front panel (DH) onto the pillars (DG). YOU WILL NEED: 6 8 7 X 4X 4 X 4 Back view Close up 67 8 9 5 6 THIS STEP REQUIRES 3 OR MORE PEOPLE. DO NOT ATTEMPT ALONE. EXTREMELY HEAVY. Position the top lid and burner box assembly (A and B) onto the cart assembly (C) as shown. in fi gure A. Use the hardware to connect both parts, on the left and right sides, at the two points indicated in fi gure B. YOU WILL NEED: YOU WILL NEED: YOU WILL NEED: ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS YOU WILL NEED: 7 8 Attach the right side shelf fascia(DD) to the right side shelf (DC). Attach the upper back panel (BI) to both the left and right side panels (DE and DF). Only install hardware in the bottom portion of the back panel, as shown in fi gure B. A B BI 6 6 11 A B C 2 2 3 4 4 4 5 5 5 7 7 7 8 8 8 BI DE DD DC Front Back B BC TIP: To position the side shelf, insert the two hooks on the side right shelf assembly into the two openings located on the upper right side panel (BC). Assemble the right side shelf assembly to the cart assembly, as shown in fi gure B. A A A C C B X 4 X 4 X 4 X 2 X 2 X 2 X 3 X 3 X 3 X 2 X 2 X 2 X 1 X 1 X 1 X 2 X 2 X 2 + B C A B 10 11 ASSEMBLY INSTRUCTIONS 9 10 YOU WILL NEED: 6 7 8 Attach the left side burner shelf fascia (DB) to the left side burner shelf table (DA). DA DB Front DA DB * A B TIP: To position the left side burner shelf, insert the two hooks on the side shelf assembly into the two openings located on the upper left side panel (BB). Assemble the left side shelf assembly to the cart assembly, as shown in fi gure B. BB ASSEMBLY INSTRUCTIONS 11 YOU WILL NEED: 12 Remove the hardware that is pre-assembled to the side burner valve bracket(CM), as shown in fi gure B. Insert the side burner valve stem through the rear of the left side shelf fascia(DB). Assemble the side burner valve to the side shelf fascia, using the hardware removed. Assemble the side burner control knob (#12) to the side burner valve (CM). Hardware may be included with the hardware pack. CM A B C C A A X 3 X 3 X 3 X 1 DA DB 12 YOU WILL NEED: 11 A B C 2 3 4 4 5 5 7 8 X 2 X 2 X 2 X 1 X 1 X 1 X 2 X 2 X 2 B ASSEMBL Y INSTR UCTIONS ASSEMBL Y INSTR UCTION S 12CN A B CL CO CP D E C CN 13 14 a. Position the side burner ( CN) through the opening in the left side burner drip pan ( CL). b. Make sure that the burner ( CN) engages the side burner valve ( CM) as shown in fi gure B. c. Using the wing nut provided, assemble the side burner ( CN) to the side burner drip pan ( CL), as shown in fi gure C. YOU WILL NEED: X 1 d. Attach the end of the side burner electrode wire ( CO...
Este manual também é adequado para os modelos :Greeley - 07012009 SA (5.84 mb)
Greeley - G41204 (5.84 mb)
Greeley - 2900S (5.84 mb)