12.05.03 INSTALLATION AND OPERATION INSTRUCTIONS CONCESSIONAIRE PORTABLE DISPENSERS Table of Contents PREPARING THE CABINET FOR USE Specifications.........................................................2 List of Included Parts.............................................3 Tools Required.......................................................3 Plumbing................................................................3 Electrical ................................................................3 Installing Casters ...................................................3 TAPPING Connecting the Keg Coupler .................................4 Tapping the Keg.....................................................4 Connecting the Regulator......................................5 Adjusting Gas Flow................................................5 CO2 Leak Test .......................................................5 Replacing a CO2 Gas Cylinder..............................5 Handling CO2 Gas.................................................5 TEMPERATURE Beer Temperature..................................................6 CLEANING Cleaning the Beer Lines ........................................7 Cleaning the Cabinet .............................................7 GENERAL INFORMATION How to Pour a Perfect Glass of Beer ....................8 Troubleshooting .....................................................9 Beer Facts .............................................................9 REPLACEMENT PARTS................................10-11 Wiring Diagram....................................................12 8300 West Good Hope Road • Milwaukee, WI 53223 • Phone 414-353-7060 • Fax 414-353-7069 Toll Free 800-558-5592 • E-Mail: Perlick@Perlick.com • MODEL NOS. DC Series IMPORTANT INFORMATION Complete the enclosed warranty card and mail to the Perlick Corporation to register the warranty. If the card is not returned, the warranty period will begin from the date the equipment is shipped from the factory. This manual has been prepared to assist you in the installation of your Concessionaire Dispenser and to acquaint you with its operation and maintenance. We dedicate considerable time to ensure that our products provide the highest level of customer satisfaction. If service is required, your dealer can provide you with a list of qualified service agents. For your own protection, never return merchandise for credit without our approval. We thank you for selecting a Perlick product and assure you of our continuing interest in your satisfaction. WARNING: When lifting, the full weight of the cabinet must be supported. Lift from the cabinet base and not from the top. Improper lifting can result in severe damage to the cabinet. Form No. Z2060A Rev. 12.05.03 MODEL NOS. DC2KP DC3KP DC4KP KEG CAPACITY 2 Keg 3 Keg 4 Keg DIMENSIONS Length Ins. (mm) 72” (1829) 84” (2134) 96” (2438) CABINET Depth Ins. (mm) 241/8” (613) 241/8” (613) 241/8” (613) Height Ins. (mm) 341/2” (876) 341/2” (876) 341/2” (876) NO. OF DISPENSING HEADS 1 1 2 NO. FAUCETS 2 2 2 CONDENSER UNIT H.P. 1/4 1/3 1/3 RUNNING LOAD - AMPS 5.9 7.5 7.5 SHIP WT lbs. (kg) 445 (202) 505 (229) 545 (247) INTERIOR Fourteen gauge stainless steel sills are reinforced with a 12 gauge angle bracket that extends from one end of the insulated base to the other. The floor pan is 20 gauge, type 304 stainless steel. The walls and ceiling are 20 gauge galvanized steel. EXTERIOR The top is 20 gauge stainless steel. Bottom is 20 gauge stainless steel. Doors, front, back and sides are 20 gauge black powder coated steel. STORAGE COMPARTMENTS Side compartment houses a four gallon stainless steel drainer overflow tank, two drain valves with garden hose fittings for cabinet floor drain and overflow tank, and 20 lb. CO2 drum holder. Front compartment provides storage for cups or other non-refrigerated items. REFRIGERATION R-134a capillary tube-type. Aluminum fin and copper tube evaporator coil. Forced air into dispensing head. Adjustable temperature control. Self-defrosting. Pull-out condensing unit for service and cleaning. VENTILATION Front ventilated. ELECTRICAL 115 Volt, 60 Hz., 1 Phase AC. Furnished with three prong, six foot rubber cord. Contact Perlick for other voltage/frequency requirements. PLUMBING None required. Condensate evaporates automatically. INSULATION Foamed-in-place polyurethane; 2” walls, 11/2” top and floor. OPTIONAL ACCESSORIES • Optional Dispensing Heads • Shelf Kit • Faucet Locks • Keg Couplers • Regulators 2 Installation and Operating Instructions Sizes and Specifications, Concessionaire Dispensers Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. CASTER MOUNTING PLATE MUST STRADDLE SEAM CASTER MOUNTING PLATE MUST STRADDLE SEAM COMPRESSOR HOUSING CENTER CASTERS REQUIRED ON DC4KP (4 KEG CONCESSIONAIRE) DRY STORAGE COMPARTMENT SCREWS Form No. Z2060A 3 Rev. 12.05.03 Perlick is committed to continuous imp...