Log:
Assessments - 4, GPA: 4 ( )

Instruções de Operação Amerec, Modelo Saunatec Water Filtration System ASX100

Fabricante : Amerec
Arquivo Tamanho: 336.55 kb
Arquivo Nome : 5e60939d-4174-422f-bc24-a7d336aa4803.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


THIS MANUAL CONTAINS IMPORTANT OPERATION, MAINTENANCE AND PRECAUTIONARY INFORMATION. PLEASE PRESENT THIS MANUAL TO USER/OPERATOR/OWNER AFTER INSTALLATION. IT IS STRONGLY ENCOURAGED THAT YOU READ THIS MANUAL BEFORE INSTALLING SYSTEM TO ENSURE THE BEST POSSIBLE INSTALLATION. INSTALLATION MUST CONFORM TO ALL LOCAL AND STATE PLUMBING CODESAND REGULATIONS. CONNECT SYSTEM TO COLD WATER SUPPLY ONLY. WATER TEMP. CAN NOT EXCEED 100°F/28°C. SYSTEM MUST BE INSTALLED IN A VERTICAL AND UPRIGHT POSITION. ASX100 SYSTEMS MUST NOT BE USED IN CONJUNCTION WITH POLYPHOSPHATE OR ANY OTHER SCALE INHIBITOR. DO NOT INSTALL FILTERS DOWNLINE FROM THE ASX 100 SYSTEM. ASX100 MUST BE THE LAST FILTER SYSTEM BEFORE THE EQUIPMENT. DO NOT USE WITH WATER THAT IS MICROBIOLOGICALLY UNSAFE OR OF UNKNOWN QUALITY WITHOUT ADEQUATE DISINFECTION BEFORE OR AFTER THE SYSTEM. NOTICE TO USER/OPERATOR/OWNER: PLEASE COMPLETE THE PRODUCT REGISTRATION CARD AND MAIL OR FAX TO MANUFACTURER. PLEASE RETAIN THIS MANUAL FOR FUTURE REFERENCE FOR PARTS, MAINTENANCE OR TROUBLE-SHOOTING. IT IS RECOMMENDED THAT ALL PERSONNEL RESPONSIBLE FOR OPERATION AND MAINTENANCE OF THIS PRODUCT READ THE PRECAUTIONS, OPERATION AND MAINTENANCE SECTIONS OF THIS MANUAL. Introduction Your new Saunatec Water Filtration System will condition the tap water providing optimum water characteristics for their specified applications. The result is reduced equipment maintenance requirements, longer equipment life and improved quality & consistency of your products. Proper system installation and routine filter changes will ensure years of trouble-free operation and performance. The ASX100 System is built with the finest and most advanced materials and each system is quality inspected and pressure tested prior to shipment. With proper installation and routine maintenance, you will have years of trouble-free operation. Please refer to this manual when performing routine filter changes. The instructions make periodic maintenance quick and easy, and ensure you will receive maximum benefit from your system. System Specifications Maximum Pressure: 125 psi/8.6 bar Maximum Temperature: 100°F/38°C, Min.: 35°F/2°C Inlet/Outlet Connections: 1/2” fnpt Service Flow Rate: 1.0 gpm /3.78 Ipm Capacity: Change ASX100 Cartridge at least once a year. 4211-161 03-07 1 ASXMiom 3/2007 Installation Precautions • Do NOT install system on line pressure above 125 psi. • Do NOT install system on HOT water line. Failure to limit line temperature to 100°F may result in housing failure and damage. • Do NOT install the system backwards with the feed water line connected to the outlet. • Do NOT use liquid pipe compounds for fitting connections. USE a maximum of two to three wraps of teflon tape. • Do NOT solder plumbing connections attached to filter housing or inlet valve. Inlet valve and filter housing will be damaged by high temperature. • Do NOT allow system to freeze. Turn off water supply to housing and drain housing if temperature falls below 32°F. • Do NOT install system in direct sunlight or where system is exposed to harsh chemicals or may be subjected to being struck by moving equipment, carts, mops or any other item that may cause damage. • ALLOW a minimum of 3" under the housing to allow for filter replacement. • IF water hammer is evident, install water hammer arrestors before ASX100 System. • Do NOT overtighten fitting connections into inlet valve or housing outlet. • Always back-up valves and fittings with a wrench when installing a fitting to avoid turning the valve. • Do NOT install the unit behind equipment where it may be difficult to access the system for filter replacement. Position the ASX100 System in a suitable location downstream from existing filters. The direction of flow through the System is always left to right; keep this in mind when determining installation location. Do NOT mount the System near any source of heat. Also, do not mount the System above any device or area that would be adversely affected by water. Installation Procedure (See Installation Drawings for Detail) 1. Turn off all equipment to be fed by the ASX100 System, locate water supply cut-off valve and turn off. 2. Determine if water line has an existing water treatment system. If so, examine system for use of poly phosphate or other scale inhibitors. The ASX100 system will not be effective if used in conjunction with other scale inhibitors. Remove the scale inhibitors from the water line or discontinue installation. 3. Install a 1/2" full-flow ball valve on the water supply side that will feed the water system. 4. Anchor the ASX100 System on a wall stud or suitable mounting material spanning wall studs. System must be upright and vertical. 5. Run a suitable line from the 1/2" full-flow ball valve at the tap water source to the inlet ball valve on the left side of the ASX100 system. Use 2-3 wraps of teflon tape and brace the inlet ball valve on the system with a wrench when connecting th...


Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias