Log:
Assessments - 3, GPA: 3.3 ( )

Instruções de Operação Black & Decker, Modelo 58-01-1805

Fabricante : Black & Decker
Arquivo Tamanho: 95.66 kb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


(.02 oz.) of grease on top of the inserted intermediate ball bearing (1) and on the intermediate pinion (22). • After inserting all gearing, place 13 gm. (.46 oz.) of grease at the armature pinion location in the gearcase (15) and fill to the top of the intermediate gear (19). Grease must contact at least 25% of the intermediate gear teeth. Before assembly, lightly coat all press fit areas with lightweight spindle oil. FIG. 4,20 5,6 NOTES: Support the output ball bearing inside the gearcase before pressing off the spindle gear. Needle bearings to be pressed flush to .010 under flush from the end which has the vendors identification. MILWAUKEE ELECTRIC TOOL CORPORATION 13135 W. LISBON RD., BROOKFIELD, WI 53005 Drwg. 3...

Este manual também é adequado para os modelos :
Brocas e shuropopverty - 54-06-2800 (95.66 kb)
Brocas e shuropopverty - 54-06-2800 (95.66 kb)
Brocas e shuropopverty - 54-06-2800 (95.66 kb)
Brocas e shuropopverty - 58-01-1805 (95.66 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias