Log:
Assessments - 2, GPA: 3 ( )

Instruções de Operação Sears, Modelo Craftsman 247-795890

Fabricante : Sears
Arquivo Tamanho: 2.63 mb
Arquivo Nome : 10126e5a-926b-1a74-49dc-64b02f8cf584.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


They are also available at most Sears retail outlets, catalog and service cent« rs. Most Sears stores can order repair parts for you, when you provide the model number of your chipper-shredc er. ENGINE Spark Plug Air Filter Muffler Engine Oil A a Gas Can Stabilizer CHIPPER-SHREDDER 4 ASSEMBLY INSTRUCTIONS T) Flat—i Washer 5/16" I.D. - Hex Lock Nut 5/16-18 Thread Hex Bolt 5/16-18 x 8-3/8" Long IMPORTANT: This unit is shipped WITHOUT GASOLINE or OIL in the engine. After assembly, see operation section of this manual for proper fuel and engine oil recommendations. NOTE: To determine right and left hand sides of your chipper-shredder, stand behind the unit with the engine the farthest away from you. See figure 6. Your chipper-shredder has been completely assembled at the factory, except for the hopper assembly (hopper hood and upper leaf ramp section have been sub-assembled), upper guide assembly, chute deflector and the catcher bag. The hardware pack safety glasses and a bottle of oil are also included in the carton. The hardware pack contains the parts shown in figure 1 (shown full size). TO REMOVE CHIPPER-SHREDDER FROM CARTON Cut the corners of the carton. Remove all packing inserts. Roll chipper-shredder out of the carton. Make certain all parts and literature have been removed before the carton is discarded. TOOLS REQUIRED FOR ASSEMBLY (1) Phillips Screwdriver (2) 1/2" or Adjustable Wrenches (2) 7/16" or Adjustable Wrenches (1) Funnel FIGURE 1. 5 I Spacers (Inside (Hinge) Housing Assemb ly Hex B Dlt Chute lector Hand Knob FIGURE 2. Hopper Inset Guide FIGURE 3. Hex Bolt 8-3/8” Long Flat Washer Hex Lock Nut Hopper Pivot_ Door Release Bar FIGURE 4. Hopper Assembly ....... ♦ Truss Screws and Nuts A Upper Guide Assembly Ipper Leaf Ramp Suction Remove 1 russ Upper screw an< I Nut Guide (Assemble Assembly Fjrst) FIGURE 5. HOW TO SET-UP YOUR CHIPPER-SHREDDER MAKE CERTAIN THE SPARK PLUG WIRE IS DISCONNECTED AND MOVED AWAY FROM THE SPARK PLUG BEFORE ASSEMBLING THE CHIPPER-SHREDDER. REFER TO FIGURE 13, PAGE 10. -ATTACHING THE CHUTE DEFLECTOR • Remove the hand knobs and cupped washers from each side of the discharge opening on the left side of the chipper-shredder. • Remove hex lock nut, two spacers and hex bolt using two 7/16" wrenches from inside the hinge on top of the housing assembly. Do not remove one spacer from the hex bolt. • Place the chute deflector in position on the discharge opening. Insert hex bolt and spacer through hinge on chute deflector and housing (spacer fits inside of hinge). See figure 2. • Place second spacer over hex bolt, inside other part of hinge. Secure with hex lock nut. Tighten securely. • Secure both sides of chute deflector to housing using hand knobs and cupped washers (cupped side of washers go against chute deflector). -ATTACHING THE UPPER GUIDE ASSEMBLY Grasp the upper guide assembly from the sides and squeeze in and slide it over the inlet guide so the edges are under the stop washers. Adjust so the holes in the upper guide assembly are aligned with the holes in the inlet guide. Insert the hex bolt, 8-3/8" long through the upper guide assembly and the inlet guide. Secure with flat washer and lock nut. NOTE: Make certain the upper guide assembly can pivot by lifting it up until it locks in the raised position. If it does not pivot freely, loosen the hex lock nut a turn or two and test. -ATTACHING THE HOPPER ASSEMBLY Your chipper-shredder has been shipped with the upper leaf ramp section attached to the hopper assembly. See figure 4. Attach the hopper assembly to the upper guide assembly as follows. Be certain to place heads of all truss machine screws inside of hopper assembly. • Remove one truss machine screw and nut from each side of hopper assembly as shown in figure 4. Push hopper pivot door down inside lower part of hopper as you place hopper assembly (both pieces) inside upper guide assembly. Replace truss screws and nuts just removed, using the hole shown in figure 4, one on each side. Tighten finger tight only. NOTE: You may have to squeeze in the sides of the hopper to start the screws. NOTE: If you have difficulty aligning the hole, loosen the two screws on the upper end of the hopper assembly. • Place the six truss machine screws and nuts found in hardware pack in the remaining holes of hopper assembly, alternating sides of the unit and tightening finger tight only. • After assembling all eight screws, tighten them SGCUTSly "ATTACHING THE CATCHER BAG Your chipper-shredder is equipped with a catcher bag to catch the shredded material. 6 • To attach the bag, place the opening of the bag over the chute deflector so it completely covers the chute opening. Depress the plunger on the drawstring, and pull on the drawstring until the bag is tight around the chute opening. Release plunger to lock it into position. See figure 5. TIRES Recommended tire pressure is 24 p.s.i. OPERATION KNOW YOUR CHIP...


Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias