Log:
Assessments - , GPA: ( )

Instruções de Operação Vermont Casting, Modelo 4040 - 4046

Fabricante : Vermont Casting
Arquivo Tamanho: 948.87 kb
Arquivo Nome :

Língua de Ensino: en

O documento está colocado, por favor, espere
O documento está colocado, por favor, espere

Facilidade de uso


There must be a gas shutoff between the stove and the supply. In order to connect Natural Gas, use a fitting with 3/8” NPT nipple on the valve side and 1/2” natural gas supply line with an input of 28,000 BTUs at a manifold pressure of 3.5” and minimum inlet supply for adjustment of 5.5” w.c. In order to connect Propane, use a fitting with 3/8” NPT nipple on the valve side and 1/2” propane gas supply line with an input of 28,000 BTUs at a manifold pressure of 11.0” and minimum inlet supply for adjustment of 11.0” w.c. Gas connection should be made in accordance with current National Fuel Gas Code, ANSI Z223.1/NFPA 54. Since some municipalities have additional local codes, be sure to consult you local authority. Connect the gas supply and test for leaks. Use a 50/50 solution of liquid soap and water to test for leaks at gas fittings and joints. NEVER test with an open flame. Light the pilot according to the directions on Psage 17, before going to the next step. CAUTION This appliance should only be connected by a qualified gas technician. Test to confirm manifold pressures as specified below. The UVS27 and its individual shutoff valve must be disconnected from the gas supply piping during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa). The UVS27 must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psig. There must be a gas shutoff between the stove and the supply. In order to connect Natural Gas, use a fitting with 1/2” NPT on the valve side and 1/2” natural gas supply line with an input of 28,000 BTUs at a manifold pressure of 3.5” between minimum inlet supply of 5.5” w.c. and maximum of 14.0” w.c. In order to connect Propane, use a fitting with 1/2” NPT on the valve side and 1/2” propane gas supply line with an input of 28,000 BTUs at a manifold pressure of 11.0” between a minimum inlet supply of 11.0” w.c. and maximum of 14.0” w.c. Install Log Set 1. Remove the logs from their packaging, and inspect each piece for damage. DO NOT INSTALL DAMAGED LOGS. 2. Install the rear log by placing it on the sheet metal shelf at the back of the firebox. (Fig. 17) The log should touch the back wall of the firebox and be centered. 3. Install the right log by placing it on the sheet metal bracket behind the grate with the right end of the log, “the thicker end”, touching the grate and the right side the firebox. Swing the left end of the log “painted end”, backward until it comes in contact with the branch on the rear log. Set the log down over the bent tab on the right. When the log is in place it rests on the tab mentioned earlier and the tip of it comes in contact with the branch on the rear log. (Fig. 17) 12 20007068 13 UVS27 Vent-Free Gas Heater 20007068 LG224 UVS27 logs in place 1/30/02 djt LG224 Fig. 18 UVS27 logs in place. LG223 UVS27 log placement 1/30/02 djt LG223 Fig. 17 Install rear, left and right logs. Left Log Right Log Rear Log 4. Install the left log by placing it on the sheet metal bracket behind the grate with the left end of the log, “the thicker end” touching the grate and the left end of the firebox. Lay the log into the recessed area on the left branch of the rear log. When the log is in place, it will rest on the left branch of the rear log toward the left side of the branch. 5. Loosely sprinkle the lava rocks directly on top of the burner just behind decorative grate. (Fig. 18) Do not place lava rocks toward back of burner. The lava rock is shipped inside the bag assembly. Complete the Installation 1. Install the screen frame by sliding the hooks over the top front edge of the firebox and resting the bottom on the support brackets. If the catalyst has been installed, place the glass front on the stove by resting the bottom edge of the frame on support brackets below the front opening of the firebox. Rotate the top edge of the assembly toward the firebox, and center it. Rotate the right and left cams towards the back of the firebox to secure glass frame in place. 2. Grasp the front plate by the window bars and lift into position engaging the two steel tabs behind the adjacent bosses in the side plates. (Fig. 19) Seat the front against the sides so the tabs at the bottom lip engage with the notches in the stove legs. On the Pinnacle, the front tabs will engage behind the notched cutouts in the base of either side plate. (Fig. 20) When properly installed, the bottom of the front plate cannot be pulled away form the sides without lifting it. NOTE: Be sure the control door can swing out. It should close against the steel tab stop. If installing the optional warming shelf, you may find it easiest to attach it to the top plate before placing the top in position on the stove. Follow the instructions supplied with the kit. ST112a front plate install fully assembled 1/04 Engage steel tabs behind the cast iron bosses Control...

Este manual também é adequado para os modelos :
Eléctrico - 4030 - 4036 (948.87 kb)
Eléctrico - 4085 - 4087 (948.87 kb)
Eléctrico - 4090 - 4092 (948.87 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias