Log:
Assessments - 3, GPA: 4 ( )

Instruções de Operação Gas-Fired Products, Modelo LTS 130

Fabricante : Gas-Fired Products
Arquivo Tamanho: 1.33 mb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


#42883120 LTU130-L5 #42883140 LTU140-L5 #42883200 LTU150-L5 #42883220 LTU160-L5 #42883240 LTU 175-1 5 ................................_#42883260 -2- Form #43155010 Feb-04 B) LTU 80-175 Body Package Descriptions (Package Number Is Indicated on the outside of each corresponding carton.) ■ LTU 80-130 (30’ TUBE) Each 30’ LTU tube heater contains one 15’ Body Package as listed below. (1) #42881000.15 Ft. Bodv Package (Oty-d containing: a) #42914000, Pre-assembled 15’ ALC steel U-tube (two 24-hole flanges) with Reflector (QTY-1) b) #42895000, Control End Reflector (QTY-1) c) #42896000, Foot End Reflector (QTY-1) d) #02266010, Speed Clips (qty-20) ■ LTU 125-175 (40’ TUBE) Each 40’ LTU tube heater contains one 15’ Body Package and one 5’ Body Package as listed below. (1) (2) #42881000,15 Ft. Body Package (QTY-1) (same as listed above) #42882000. 5 Ft. Bodv Package (OTY-n containing a) #42915000, Pre-assembled 5’ ALC steel tube (two 24-hole flanges) with Reflector (QTY-1) b) #42907020. Bodv Fastener Kit (OTY-1) containing: #02167010. Vk-20 Locknuts (OTY-121 #02259000, Vi-20 Machine Screws (QTY-12) #02266010, Speed Clips (QTY-2) c) #42921000, Tube Flange Gasket (QTY-2) 4) LTU 80-175 SERIES - DIMENSIONS MODELS: LTU 80-30 LTU 90-30 LTU 100-30 LTU 110-30 LTU 120-30 LTU 125-30 LTU 130-30 Side View 11" <- 5-1/2" 7" ^ \ ■■ Bottom View . Emitter Tube Reflector 15 Ft. Body Section »MODELS: LTU 125-40 LTU 130-40 LTU 140-40 LTU 1 50-40 LTU 160-40 LTU 175-40 Side View * -> 11" «-5-1/2" Ï- 7" i. . j. . 1 ir —------ Tube Support/Hanger Bracket (QTY-5) Bottom View *These models require the use of an additional 5 ft. body section. Emitter Tube Reflector ~Z_ 5 Ft. Body Section 15 Ft Body Section Junction Box Exhaust Hood -Required for UNVENTED use- 4"x6" Starting Collar 5) LTU 80-175 SERIES - HEATER ASSEMBLY 1. Place the flanges of the control end reflector (packaged with the 15’ body section) flush with the end of the body reflector. Secure by sliding the speed clips onto the reflector edges. Evenly space the speed clips on the sides and top of the reflector to provide a snug fit. Place the foot end reflector (not shown) on the opposite end of the body reflector and secure as described above. DO NOT relocate the tube support/hanger brackets, especially at the control end of the heater. Slide the reflector toward the U-bend and leave a 3” space between the control end reflector and the control box. 2. Attach the control box and gasket to the right hand tube flange and secure with the Ya-20 locknuts. The control box must be mounted with the perforated fresh air plate on top, facing the ceiling. Attach the draft inducer assembly and gasket to the left hand tube flange and secure with the Va-20 locknuts. A flue restrlctor plate Is attached to the draft inducer weld stad. Make sure this remains In place while the draft inducer is being attached to the...

Este manual também é adequado para os modelos :
Eléctrico - LTS 100 (1.33 mb)
Eléctrico - LTS 110 (1.33 mb)
Eléctrico - LTS 120 (1.33 mb)
Eléctrico - LTS 125 (1.33 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias