Log:
Assessments - 2, GPA: 3 ( )

Instruções de Operação Desa, Modelo (V)JM36

Fabricante : Desa
Arquivo Tamanho: 1.71 mb
Arquivo Nome : 0aab81ec-aa9b-8e94-516c-f54f460d5ac3.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Position the retainer brackets at 8 3/4" apart from center to center of notch. Model Distance Apart JM50 8 3/4" Centers JM42 4 1/4" Centers JM36 3 1/4" Centers Brackets Location See Chart for Grate Retainer Figure 22 - Installing Grate Retainer Bracket GROUTING INSTRUCTIONS Material provided: 2 - 9 lb. bags of cement 2 - 9 lb. gas of sand Material required: 1 - Piping bag 1 - Joints striker 1 - Heavy duty mixing bucket 1 - Trowel 1. Moisten brick surface with a damp sponge or a spray bottle just prior to application. When the bricks are wet, any excess grout mixture that might have gotten onto the brick will easily wipe off. 2. In a heavy duty mixing bucket, pour seven (7) cups of water in first, then add in 4.5 lbs. (half of a bag) of sand and 4.5 lbs (half of a bag) of cement. Mix together well using a power drill with a mixing wand attachment. 3. The overall length of the piping bag should be about 16". If the bag is longer than 16", cut it down to size by removing the end with the larger opening. This will make the bag easier to handle. 4. Put 2 to 3 cups of the grout mixture into the piping bag making sure the smaller opening is downward and over a moist towel to avoid spilling. Place a wet towel over the bucket making sure it is directly on the surface of the grout mixture. This will keep the mixture moist and not dry out before use. 5. Begin grouting by first doing a “Filler Pass”. This is done by filling the joint about 3/4 full with the grout mixture. It is important to work with 6 bricks at a time so that the grout doesn't have time to set-up before striking. 6. Complete a “Finishing Pass” around 6 bricks you just put the filler pass around. This is done by slowly filling in the remainder of the joint with a thick amount of the grout mixture. The mixture should be a little higher than the brick surface. 7. Using a trowel, remove the excess grout mixture by moving the trowel in the direction of the joint. The grout mixture in the joint should now be flush with the brick surface. 8. Using a Joint Striker, force the grout mixture into the joint and sweep back and forth until the grout is smooth and round. If when pressing the grout into the joint it becomes too shallow, add more grout mixture with the piping bag and then strike again. 9. Continue the procedure around each group of 6 bricks until an entire panel is finished. 10. Using the trowel, scrape in the direction of the joints to remove any grout that may have collected around the bricks during striking. If desired, take a moist sponge and lightly sweep over the bricks to remove any grout that may have gotten on the bricks. DO NO PRESS HARD OR RUB IN A CIRCULAR MOTION. This will press the grout into the brick and turn the brick a different color. Allow 72 hours before operating fireplace. Figure 23 - Grouting Brick 117541-01A GLASS DOOR INSTALLATION IMPORTANT: Install glass door frame first before installing glass door. DOOR FRAME ASSEMBLY Inset L-shaped gussets starting at the left top portion of door frame. Gusset holes should align with screw holes on the frame. Secure using flat head screws. INSTALLING GLASS DOORS Spring clips have been installed but some adjustments may be needed. Install the doors using the following steps: 1. With bi-fold doors completely folded, insert bottom pivot pin into pivot hole located near bottom corner of front face opening and swing door to vertical position making sure top pins slide into door track. Door is installed when top door pin snaps into spring clip. 2. Repeat step 1 for remaining door. If you find the doors do not close properly or do L-Shaped Gusset Top Bottom Figure 24 - Assembling Door Frame INSTALLING DOOR FRAME To install glass door frame, construct an opening (see table) on the front face of the fireplace. Insert door frame into face opening and tighten screws (see Figure 25). not appear level or straight, proceed with section Flat Head Screw on door adjustment, Spring and Slide Fold Door Clip Top pins Into Track Insert Pin into Spring Clip Insert Bottom Pivot Pin into Hole Pivot Hole Figure 26 - Installing Bi-Fold Doors MODEL A B JM50 51" +/- 1/4" 34" +/- 1/4" JM42 43" +/- 1/4" 34" +/- 1/4" JM36 37" +/- 1/4" 34" +/- 1/4" Figure 25 - Installing Door Frame 1" Cap Screw Left and Right 3/4" Cap Screw Top and Bottom A B DOOR ADJUSTMENT Remove doors and slightly loosen lower pivot clips and upper spring clips. Replace doors and fully close them. Use 1/8" shims (any material) to level doors. Once proper setting is achieved, carefully open doors enough so that you can access spring clips with a phillips screwdriver. Tighten screws. See Figure 27. Figure 27 - Adjusting Bi-Fold Doors 117541-01A OPERATION AND MAINTENANCE GUIDELINES GLASS DOORS Glass doors are optional with the fireplace. When the fireplace is in operation, doors must be fully opened or fully closed position only or a fire hazard may be created (see Figure 28). A fireplace equipped with glass doors opera...

Este manual também é adequado para os modelos :
Lareiras - (V)JM42 (1.71 mb)
Lareiras - (V)JM50 (1.71 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias