Log:
Assessments - 1, GPA: 5 ( )

Instruções de Operação Excalibur electronic, Modelo P95-NG3

Fabricante : Excalibur electronic
Arquivo Tamanho: 5.06 mb
Arquivo Nome : 0345425d-cf5b-4fa0-8b4a-343d8a01ab0a.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Space the stand-offs centrally, approximately 2 or 2-1/2 feet apart. Ensure that the unit is not unstable. 3) For exterior walls, insulate the enclosure to the same degree as the rest of the house, apply vapour barrier and drywall, as per local installation codes. (Do not insulate the fi replace itself.) Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace 9 INSTALLATION Fireplace Stand No hearth is required when the unit is raised 3" (76mm) off of the floor surface Flooring HEARTH REQUIREMENTS Floor Mounted Fireplaces FACING REQUIREMENT Facing Over 1" (25mm) Thick If the facing material is over 1" (25mm) thick (example: brick or river rock), install the facing around the perimeter of the face. You may wish to make a face template as shown on the diagram. FPI offers a cover plate template. See the "Optional Cover Plate Template" section. NOTE: If using a brick hearth, the fi replace will need to be raised to accommodate the brick thickness. Example: If the brick is 2" thick, the unit must be raised 1". 53-3/4” 48-3/4” Header CL 2-1/4” 21-1/8” (533mm) 2" Gas connection on this side Non-combustible Material Combustible Material 11” dia. hole through wall for Flex or for DuraVent 4" 2-7/8” Note: 53-3/4" is the minimum height for both fl ex termination or Simpson Dura-Vent venting. 4) Note: The unit does not have to be completely enclosed in a chase. The clearance on top of the unit is 0" to the standoffs so combustible building materials can be laid directly on top of the standoffs. You must maintain clearance from the vent to combustible materials for both rigid and fl ex, see the "Clearances" section. You must take into account the depth of the fl oor covering (carpet, tile, linoleum, etc.) when determining the height of the fi replace stand. Raised Fireplaces Please note that all vertical measurements are taken from the base of the unit excluding risers or bottom stand-offs. The HeatWave Duct Kit has different clearance and framing requirements, check the HeatWave manual for details. This fi replace requires a non-combustible material extending from the framing header and sides. The fl anges on the front face of the fi replace are for a facing thickness of 1" (25mm). INSTALLATION OPTIONAL COVER PLATE TEMPLATE 1) Ensure top clip screws are at top of oblong holes before installation. Oblong Screw Holes 2) Position bottom of cover plate over pins located at the bottom of the firebox. Pins 3) Bring cover plate towards the unit and hook top clip over and behind the glass frame. The top clip may need to be adjusted. Loosen the 2 screws that secure the top clip to let the cover plate settle over and behind the glass frame. Once settled tighten screws. Back View of Cover Plate Pin Holes Top Clip TO REMOVE: 1) Remove 2 screws that secure top clip. Ensure to hold cover plate as it will fall forward. 2) Pull out top clip that is still hooked onto glass. UNIT ASSEMBLY PRIOR TO INSTALLATION The 2 Top Standoffs must be correctly positioned and attached to the top before unit is slipped into position. Top Standoff Assembly The top standoffs are shipped in a flat position and must be folded into shape and attached. 1) Remove the standoffs from the fireplace top. 2) Take each standoff and bend into the correct shape. Bend up at the bend lines until the screw holes in the standoff and the pre- punched screw holes on the fireplace top line up. 3) Attach the standoff securely to the top with 2 screws per standoff (on opposite corners). Side Nailing Strips The side nailing strips come attached to the unit. There are 2 plates, one on the top and bottom that can be folded out as required. Plates can be folded out. VENTING INTRODUCTION The P95-3 uses the "balanced flue" technology Co-axial system. The inner liner vents products of combustion to the outside while the outer liner draws outside combustion air into the combustion chamber thereby eliminating the need to use heated room air for combustion and losing warm room air up the chimney. Note: These flue pipes must not be connected to any other appliance. The gas appliance and vent system must be vented directly to the outside of the building, and never be attached to a chimney serving a separate solid fuel or gas burning appliance. Each direct vent gas appliance must use it's own separate vent system. Common vent systems are prohibited (see "Simpson Dura-Vent Venting" section for more details and exceptions). Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace INSTALLATION VENTING FPI Direct Vent System Flex Horizontal Terminations Only These venting systems, in combination with the P95-3 Direct Vent Gas Fireplace, have been tested and listed as a direct vent heater system by Warnock Hersey. The location of the termination cap must conform to the requirements in the Vent Terminal Locations diagram from the "Exterior Vent Termination Locations" section. FPI Direct Vent Flex System Termination Kit (Part # 946-61...

Este manual também é adequado para os modelos :
Lareiras - P95-LP3 (5.06 mb)
Lareiras - P95-LP3 (5.06 mb)
Lareiras - P95-NG3 (5.06 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias