Log:
Assessments - 2, GPA: 5 ( )

Instruções de Operação Lennox Hearth, Modelo UVFRC-4228

Fabricante : Lennox Hearth
Arquivo Tamanho: 1.06 mb
Arquivo Nome :
Língua de Ensino:
Ir para baixar



Facilidade de uso


Refer to National Fuel Gas Code, ANSI Z223.1 1992, Section 5.3. b. Vent room directly to the outdoors. Refer to National Fuel Gas Code, ANSI Z223.1 1992, Section 5.3. c. Install a lower BTU/Hr heater, such as a 21,000 BTU/Hr, to make the area an unconfined space. If the actual BTU/Hr used is less than the maximum BTU/Hr the space can support, then the space is an unconfined space. You will need no additional fresh air ventilation for an unconfi ned space. COLD CLIMATE INSULATION For cold climate installations, seal all cracks around the appliance with noncombustible material and wherever cold air could enter the room. It is especially important to insulate outside cavities between studs and under floor on which the appliance rests, if floor is above ground level. Gas line holes and other openings should be caulked with high temperature caulk or stuffed with unfaced fiberglass insulation. If the fireplace is being installed on a cement slab, in cold climates, a sheet of plywood or other raised platform can be placed underneath to prevent conducting cold up into the room. It also helps to sheetrock inside surfaces and tape for maximum air tightness and caulk fi restops. NEW YORK CITY, NEW YORK (MEA) Installation of these fireplaces are approved for installation in New York City in the US state of New York. Note: The following requirements reference various Massachusetts and national codes not contained in this document. Requirements for the Commonwealth of Massachusetts Un-vented Room Heaters shall be installed in accordance with 527 CMR 30.00 and 248 CMR 3.00 through 7.00: (a) Permits and Inspections: In addition to complying with 248 CMR 3.05 the following requirements must be satisfi ed: 1. A permit shall be obtained from the head of the fire department and the local or state gas inspector having jurisdiction for the installation of all unvented propane or natural gas-fi red space/room heaters. 2. The permits shall be conditioned upon final inspection and approval of installation by the head of the fire department and the local or state gas inspector having jurisdiction. 3. A copy of the manufacturer’s installation/operating literature shall be submitted with each permit application. 4. Before operation, the Head of the Fire Department and the local or state gas inspector shall inspect the installation for compliance with 527 CMR (Board of Fire Prevention Regulations) and 248 CMR (Board of State Examiners of Plumbers and Gas Fitters). 5. A final inspection by the state or local gas inspector of the unvented space/room heater shall not be performed until proof is provided that the head of the fire department having jurisdiction has granted a permit. (b)Unvented propane or natural gas-fired space/room heaters shall conform to ANSI Z21.11.2, be equipped with an oxygen depletion safety (ODS) shutoff system and be Product-approved in accordance with 248 CMR. (c)Unvented propane or natural gas-fired space/room heaters sha...

Este manual também é adequado para os modelos :
Fans - UVFRC-3628 (1.06 mb)
Fans - UVFRC-3628 (1.06 mb)
Lareiras - UVFRC-3628-H (1.06 mb)
Lareiras - UVF-36 (1.06 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias