Log:
Assessments - 1, GPA: 3 ( )

Instruções de Operação Hearth and Home Technologies, Modelo 6000GL-IPI-R

Fabricante : Hearth and Home Technologies
Arquivo Tamanho: 3.33 mb
Arquivo Nome : f486d4f0-6413-491b-bd13-7ea72d64f1a9.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


• Secure the appliance to the floor by inserting two screws through the pilot holes at the bottom of the appliance. Figure 9.9 Proper Positioning and Securing of an Appliance NAILING TABS (BOTH SIDES) PILOT HOLES Heat & Glo • 6000GL-IPI-R, 6000GL-IPI-S • 2102-900 Rev. O • 12/08 10 Installing Vent Pipe (DVP and SLP Pipe) 10 A. Assemble Vent Sections (DVP Pipe Only) Attach Vent to the Firebox Assembly Note: The end of the pipe sections with the lanced tabs will face toward the appliance. Attach the first pipe section to the starting collar: • Lanced pipe end to the starting collar • Inner pipe over inner collar • Push the pipe section until all lanced tabs snap in place • Lightly tug on pipe to confirm it has locked. Commercial, Multi-family (Multi-level exceeding two stories), or High-Rise Applications All outer pipe joints must be sealed with high temperature silicone, including the slip section that connects directly to the horizontal termination cap. • Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections. See Figure 10.1 • Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed in this manner, unless otherwise stated. WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when removing termination cap from slip pipe. If slip section seals are broken during removal of the termination cap, vent may leak. Assemble Pipe Sections Per Figure 10.2: • Start the inner pipe on the lanced end of section A into the flared end of section B. • Start the outer pipe of section A over the outer pipe of section B. • Once both vents sections are started, push fi rmly until all lanced tabs lock into place. • Lightly tug on the pipe to confirm the tabs have locked. It is acceptable to use screws no longer than 1/2 in. (13 mm) to hold outer pipe sections together. If predrilling holes, DO NOT penetrate inner pipe. For 90. and 45. elbows that are changing the vent direction from horizontal to vertical, one screw minimum should be put in the outer flue at the horizontal elbow joint to prevent the elbow from rotating. Use screws no longer than 1/2 in. (13 mm). If predrilling screw holes, DO NOT penetrate inner pipe. Figure 10.1 High Temperature Silicone Sealant Figure 10.2 A B LancesLances Figure 10.3 Figure 10.4 Seams Note: Make sure that the seams are not aligned to prevent unintentional disconnection. INCORRECT CORRECT Heat & Glo • 6000GL-IPI-R, 6000GL-IPI-S • 2102-900 Rev. O • 12/08 B. Assemble Vent Sections (SLP Pipe Only) To attach the first vent component to the starting collars of the appliance: • • Attach a DVP-2SL or DVP-SLP24 adapter to the starting collar of the appliance. • Lock the vent components into place by sliding the pipe section onto the collar. • Align the seam of the pipe and seam of collar to allow engagement. Rotate the vent component to lock into place. Use this procedure for all vent components. See Figure 10.5. • Slide the gasket over the first vent section and place it flush to the appliance. This will prevent cold air infiltration. High temperature caulk may be used to hold the part in place. • Continue adding vent components, locking each succeeding component into place. • Ensure that each succeeding vent component is securely fitted and locked into the preceding component. Commercial, Multi-family (Multi-level exceeding two stories), or High-Rise Applications For Installation into a commercial, multi-family (multi-level exceeding two stories) or high-rise applications: All outer pipe joints must be sealed with high temperature silicone, including the slip section that connects directly to the horizontal termination cap. • Apply a bead of silicone sealant inside the female outer pipe joint prior to joining sections. See Figure 10.1. • Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed in this manner, unless otherwise stated. WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when removing termination cap from slip pipe. If slip section seals are broken during removal of the termination cap, vent may leak. Note: Align seams to engage pipe, then rotate counterclockwise to lock Figure 10.5 Adding Venting Components C. Assemble Slip Sections • Slide the inner flue of the slip section into the inner fl ue of the pipe section and the outer flue of the slip section over the outer flue of the pipe section. See Figure 10.6. • Slide together to the desired length. Pilot holePilot hole Figure 10.6 Slip Section Pilot Holes • Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section. • Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the slip section. See Figure 10.7. Figure 10.7 Screws into Slip Section • Continue adding pipe as necessary following instructions in “Assembling Pipe Sections.” NOT...

Este manual também é adequado para os modelos :
Lareiras - 6000GL-IPI-S (3.33 mb)
Lareiras - 6000GL-IPILP-R (3.33 mb)
Lareiras - 6000GL-IPILP-S (3.33 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias