Log:
Assessments - 1, GPA: 3 ( )

Instruções de Operação Havis-Shields, Modelo PKG-DS-PAN-412

Fabricante : Havis-Shields
Arquivo Tamanho: 3.5 mb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


USB 2.0 PERIPHERALS WILL OPERATE IN THIS PORT HOWEVER, USB 3.0 PERIPHERALS WILL NOT OPERATE IN ANY OF THE THREE (3) USB 2.0 PORTS 5 • 1-800-524-9900 Installation 1) Remove the Mounting Bracket from the packaging. Install the Mounting Bracket to the Motion Device using (3) 1/4“-20 x 5/8” long screws (Hardware Kit Item 3). Torque screws to 80 in-lbs (9.0Nm) ± 10%. NOTE: Numerous hole patterns present in Mounting Bracket will accomodate Havis Motion Devices as well as most competitors’ 1/4”-20 Screws Mounting Bracket Typical Motion Device Example (not included) NOTE: We recommend applying a drop of medium strength (blue) thread locking adhesive to the threads of all fasteners. 2) Lower the Docking Station to the Mounting Bracket as shown and secure with (4) 1/4”-20 x 5/8” long screws (Hardware Kit Item 3). Torque screws to 80 in-lbs (9.0 Nm) ± 10%. 1/4”-20 Screws 6 Cable Management 1) Tip the Docking Station to a position that is comfortable to work with. 2) Install all cables that are necessary for computing needs. 3) Use Zip Ties (Hardware Kit Item 1) to strain relieve cables at rear of Docking Station. IF SECURING EXTERNAL ANTENNAS TO DOCKING STATION (DS-PAN-411-2, DS-PAN-412-2, PKG-DS-PAN-412-2) LEAVE AN ADEQUATE SERVICE LOOP BETWEEN THE ANTENNA CONNECTOR AND THE FIRST ZIP TIE ON THE DOCKING STATION TO ENSURE LATCHING AND UNLATCHING MOTION IS NOT RESTRICTED. 4) Gather all cables to one side and tie off to unused holes on underside of Docking Station. Insert as many zip ties as necessary to secure cables. 7 • 1-800-524-9900 Cable Management (continued) 5) Create a service loop with cables to ensure that no tension is on the connectors and to enable intended motion. 6) Tie off cables onto a stationary part of the mounting system. This loop must be large enough to allow full range of expected rotation and extension without stressing connections. Collect cables and secure to the mounting system. (Note: Mounting system not included) 8 Operation - Docking DO NOT FORCE LAPTOP ONTO DOCKING STATION. IF THERE IS RESISTANCE, CHECK ALIGNMENT OF COMPUTER ON DOCKING STATION. 1) Ensure Docking Station is unlatched by depressing button in Barrel Lock. 2) With rear of computer elevated, load front of computer into Docking Station ensuring the computer’s handle extends under the Front Hold-Down Bracket. Take care to center computer in Docking Station when lowering and ensure alignment of the front feet of computer with the plastic guides on the Docking Station. 3) Lower back of computer onto Docking Station, ensuring computer properly aligns with both Locator Pins in Docking Station. With computer seated on Docking Station, apply light downward pressure to the rear of computer and pull the Front Latching Handle forward until latched. 4) For theft deterrence, secure computer by locking Docking Station with supplied key (Hardware Kit Item 2). 9 • 1-800-524-9900 Operation - Undocking 1) If previously locked, unlock Docking S...

Este manual também é adequado para os modelos :
Acessórios de computador - DS-PAN-411 (3.5 mb)
Acessórios de computador - DS-PAN-411-2 (3.5 mb)
Acessórios de computador - DS-PAN-412 (3.5 mb)
Acessórios de computador - DS-PAN-412-2 (3.5 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias