Log:
Assessments - 3, GPA: 3.3 ( )

Instruções de Operação Dell, Modelo SPARC ENTERPRISE T5120

Fabricante : Dell
Arquivo Tamanho: 3.94 mb
Arquivo Nome : d2fc720f-fbe2-495b-aa40-fef22820ac8b.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


If you have purchased other optional components such as additional memory, install them prior to mounting the server in a rack. See “Optional Component Installation” on page 3. 4. Mount the server into a rack or cabinet. See “Installing the Servers in a Rack” on page 16 for both the 1U and 2U servers. Or, if you ordered the Express rail rackmounting kit, which has the same rack rail assemblies for both servers, see “Installing the Servers in a Rack With Express Rails” on page 71. 4 SPARC Enterprise T5120 and T5220 Servers Installation Guide • August 2007 Note — In the rest of this manual, the term rack means either an open rack or a closed cabinet. 5. Connect the server to a serial terminal or a terminal emulator (PC or workstation) to display system messages. See “Powering On the System for the First Time” on page 41. Tip- The serial terminal or a terminal emulator should be connected before you connect the power cables. As soon as AC power is connected to the system, the service processor immediately powers on and runs diagnostics. Diagnostic test failures will be printed on the serial terminal. For more information, refer to the Integrated Lights Out Manager 2.0 Supplement for SPARC Enterprise T5120 and T5220 Servers. 6. Connect the data cables to the server, but do not connect the AC power cable yet. See “Connecting the Server Cables for Both Servers” on page 32. 7. Connect the AC power cable to the server and examine the display for any error messages. See “Powering On the System for the First Time” on page 41. Caution — There is a potential for electric shock if the server and related equipment are not properly grounded. Note — The service processor runs on the 3.3V standby voltage. As soon as AC power is connected to the system, the service processor immediately powers on, runs diagnostics, and initializes the ILOM firmware. 8. After the service processor boots, access the ILOM command-line interface (CLI) through the serial management port. See “To Log Into the Service Processor Using the Serial Management Port” on page 47. 9. Configure the service processor network addresses. See “To Configure the Service Processor Network Management Port” on page 48. Note — The service processor network management port is not operational until you configure network settings for the service processor (through the service processor serial management port). 10. Commit the changes to the service processor network parameters. See Step 7 in “To Power On the System for the First Time” on page 43. Chapter 1 Preparing for Installation 5 11. Power on the server from a keyboard using the ILOM software. See “To Power On the System” on page 53. 12. Configure the Solaris OS. See “Booting the Solaris Operating System” on page 57. The Solaris OS is preinstalled on the servers. When you power on, you are automatically guided through the Solaris OS configuration procedure. 13. Install any required patches to the server. Refer to the SPARC Enterprise T5120 and T5220 Server Product Notes for a list of required patches. 14. Load additional software from the Solaris media kit (optional). The Solaris media kit (sold separately) includes several CDs containing software to help you operate, configure, and administer your server. Refer to the documentation provided with the media kit for a complete listing of included software and detailed installation instructions. Cabling Notes for Both Servers ■ Minimum cable connections for the servers: ■ At least one system on-board Ethernet network connection (NET port) ■ The service processor serial management port (SER MGT port) ■ The service processor network management port (NET MGT port) ■ Power cables for the two system power supplies ■ Service processor management ports: There are two service processor management ports for use with the ILOM service processor. ■ The service processor serial management port (labeled SER MGT) uses an RJ-45 cable and is always available. This is the default connection to the ILOM service processor. ■ The service processor network management port (labeled NET MGT) is the optional connection to the ILOM service processor. This port is not available until you have configured network settings for the service processor (through the service processor serial management port). See “Enabling the Service Processor Network Management Port” on page 46. The service processor network management port uses an RJ-45 cable for a 10/100 BASE-T connection. This port does not support connections to Gigabit networks. See the SPARC Enterprise T5120 and T5220 Servers Overview for more information. 6 SPARC Enterprise T5120 and T5220 Servers Installation Guide • August 2007 в Ethernet ports are labeled NET0, NET1, NET2, and NET3. The Ethernet interfaces operate at 10 Mbps, 100 Mbps, and 1000 Mbps. The transfer rates for the Ethernet ports are given in TABLE 1-1. TABLE 1-1 Ethernet Connection Transfer Rates Connection Type IEEE Terminology Transfer Rate ...

Este manual também é adequado para os modelos :
Computadores - SPARC ENTERPRISE T5120 (3.94 mb)
Computadores - SPARC ENTERPRISE T5220 (3.94 mb)
Computadores - SPARC ENTERPRISE T5220 (3.94 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias