Log:
Assessments - , GPA: ( )

Instruções de Operação NuTone, Modelo HEAT-A-VENTLITE 9965

Fabricante : NuTone
Arquivo Tamanho: 458.91 kb
Arquivo Nome : 9965ins89356.pdf

Língua de Ensino: en

O documento está colocado, por favor, espere
O documento está colocado, por favor, espere

Facilidade de uso


Installation in an existing, finished building requires an accessible area (attic or crawl space) above the planned location. See “INSTALLATION IN EXISTING CONSTRUCTION.” Do not install closer than 12 inches to a vertical surface. Do not install over tub or shower enclosure. UNIT DIMENSIONS Refer to Figure 1 for housing's dimensions. NOTE: If there will be a finished second floor above, the Model 9965 housing requires a minimum of 2" x 8" joist construction for mounting. WIRING AND DUCTWORK 1. Run the required wiring during rough-in stage of construction. 2. Total connected load: 1730 watts. 3. Plan to run 120vAC, 60 Hz wiring (with ground) on a separate 20 Amp circuit from a power source, through the provided wall switch, to the housing's junction box. See wiring diagram. 4. Use 4" round duct. INSTALLATION IN NEW CONSTRUCTION PREPARATION 1. Install hanger bar brackets in slots in housing. (See Fig. 3) Do not tighten completely to allow bars to be inserted. 2. Refer to Figure 2. Insert hanger bars into brackets. 3. Refer to Figure 3. Slide hanger bar brackets down to end of slot closest to outside edge of housing. Tighten brackets in this position. 4. Refer to Figure 4. Remove junction box cover by removing one screw. 5. Refer to Figure 4. Remove appropriate wiring knockout(s) and install approved box connector(s). FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 73.4" 14" HANGER BARS ADJUSTMENT SLOT JUNCTION BOX COVER KNOCKOUTS 93.4" MOUNTING THE HOUSING 1. Locate housing between joists. 2. Refer to Figure 5. Using nails, secure hanger bars to joist. NOTE: The hanger bar brackets are adjustable. Allowing for the thickness of the finished ceiling, mount hanger bars so that edge of housing will be flush with the finished ceiling. 3. Adjust brackets as required. Tighten brackets. INSTALLING THE DUCTWORK 1. Refer to Figure 5. Install duct collar. 2. Using 4" round duct, connect duct to collar and tape connection. INSTALLING THE SWITCH 1. Install double-gang switch box in chosen location. 2. Refer to Figure 6. Run wiring and make wiring connections. 3. Use supplied screws to secure switch bracket assembly to switch box. 4. Using supplied screws, secure wall plate to switch bracket. INSTALLING AND CONNECTING THE WIRING Refer to Figure 6. All wiring must comply with local codes and unit must be properly grounded. 1. Using 12-gauge wire, run 120vAC, 60 Hz wiring (with ground) from a power source to the wall switch location. The unit must be wired on a separate 20 Amp circuit. 2. Run wiring from switch location to housing as shown in the wiring diagram. 3. Make wiring connections as shown in wiring diagram. 4. Replace junction box cover. Slide slotted hole in cover over screw. Tighten screw securely. 5. Secure wire cover with one screw. 6. Insert heater and ventilator plugs into proper receptacles as shown. FIGURE 5 DUCT COLLAR MOUNTING THE GRILLE ASSEMBLY 1. Refer to Figure 7. Place the reflector into the grille. 2. Refer to Figure 8. Insert light plug and night light plug into receptacles. 3. Refer to Figure 7. Using two provided screws, secure grille and reflector to housing. 4. Install 100 watt (maximum) light bulb into light socket. 5. Install 7 watt (maximum) C-7 candelabra type bulb into night light socket. 6. Refer to Figure 9. Snap lens into place. FIGURE 7 FIGURE 6 GRILLE REFLECTOR (LENS OMITTED FROM DRAWING FOR ILLUSTRATIVE PURPOSES) HEATER JUNCTION BOX HEATER (WHITE)LIGHT REDWHTBLK WHT BLKWHTWHTBLU VENT NIGHT LIGHT SWITCH BOX HEAT LIGHT VENT NIGHT LIGHT 120vAC LINE GROUNDWHITEBLACK T NOTE: WHEN THERMOSTAT OR TIMER IS USED, CONNECT AT T INSTALLATION IN EXISTING CONSTRUCTION In an existing, finished building, installation of the HeatVent- Light Combination requires an accessible area (attic or crawl space) above the planned location. If the location that has been chosen for installation has a finished floor above it, be certain there is sufficient space available to install the housing and make the necessary duct connection. PLANNING Review “INSTALLATION IN NEW CONSTRUCTION” and follow all instructions that apply. CAUTION: Check the area above the planned location to make sure that: (1) Ducting can be installed. (2) Wiring can be run to the planned location. (3) No wiring or other obstructions might interfere with the installation. INSTALLATION 1. The housing must be mounted between ceiling joists. 2. Refer to Figure 10. Mark ceiling for cutout. Cutout dimensions: 141.8" long x 97.8" wide. Make cutout in ceiling. 3. Follow steps under “PREPARATION” page 1. 4. From above, lower housing into the cutout and secure hanger brackets. Install duct collar, connect duct, and run wiring through box connectors. 5. From below, adjust housing so that it is flush with the finished ceiling. 6. Form below, make wiring connections as shown in figure 6. 7. Replace junction box cover. 8. Insert heater, ventilator, light, and night light plugs into proper receptacles. 9. install grille, reflector and lens. HEAT VENT WHITE FIGURE 10 FIGUR...

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias