Log:
Assessments - 3, GPA: 4 ( )

Instruções de Operação Carrier, Modelo 38AH044-084

Fabricante : Carrier
Arquivo Tamanho: 2.25 mb
Arquivo Nome : 38ah-15si.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


1-37 Step 1 — Rig and Place Unit ............... 1 • DOMESTIC UNITS • EXPORT UNITS • PLACING UNITS Step 2 — Check Compressor Mounting ..... 3 • UNITS 38AH044-084 • UNITS 38AH094-134 Step 3 — Make Refrigerant Piping Connections .............................. 14 • UNITS 38AH044-084 • UNITS 38AH094-134 Step 4 — Make Electrical Connections ...... 23 • POWER SUPPLY • FIELD POWER CONNECTIONS • MAIN POWER • CONTROL CIRCUIT WIRING Step 5 — Install Accessories ............... 37 • LOW-AMBIENT OPERATION • MISCELLANEOUS ACCESSORIES PRE-START-UP .......................... 37,38 START-UP ................................ 38-45 SERVICE .................................. 46-49 CONTROL ................................ 49-52 TROUBLESHOOTING ...................... 53,54 START-UP CHECKLIST ...............CL-1, CL-2 SAFETY CONSIDERATIONS Installing, starting up, and servicing this equipment can be hazardous due to system pressures, electrical components, and equipment location (roofs, elevated structures, etc.). Only trained, qualified installers and service mechanics should install, start up, and service this equipment. Untrained personnel can perform basic maintenance functions, such as cleaning coils. All other operations should be performed by trained service personnel. When working on the equipment, observe precautions in the literature, and on tags, stickers, and labels attached to the equipment and any other safety precautions that may apply. • Follow all safety codes. • Wear safety glasses and work gloves. • Use care in handling, rigging, and setting bulky equipment. ELECTRICSHOCKHAZARD. Openallremotedisconnectsbeforeservicingthisequipment. Step 1 — Rig and Place Unit — All units are designed for overhead rigging, and it is important that this method be used. Lifting holes are provided in the frame base rails, which are marked for rigging (see rigging label on the unit and Tables 1, 2A, and 2B for rigging weights and center of gravity). It is recommended that field-supplied pipes, of sufficient length to extend at least 12-in. (305 mm) beyond the frame, be passed through the holes. To maintain unit stability while lifting, use 4 cables, chains, or straps of equal length. Attach one end of each cable to one pipe end and the other end of each cable to the overhead rigging point. Use spreader bars or frame to keep the cables, chains, and straps clear of the unit sides. Leave standard coil protection packaging in place during rigging to provide protection to coils. Remove and discard all coil protection after rigging cables are detached. DOMESTIC UNITS — For units 38AH044-084, 124, and 134; standard unit packaging consists of coil protection only. There is no standard packaging provided for units 38AH094 and 104. Skids are not provided. If overhead rigging is not available at the jobsite, place the unit on a skid or pad before dragging or rolling. When rolling, use a minimum of 3 rollers. When dragging, pull the pad or skid. Do not apply force to the unit. When in final position, raise from above to lift unit off the pad or skid. EXPORT UNITS — All export units are mounted on skids with vertical coil protection. Leave the unit on the skid until it is in final position. While on the skid, the unit can be rolled or skidded. Apply force to the skid, not to the unit. Use a minimum of 3 rollers when rolling. When in final position, raise from above to remove the skid. PLACING UNITS Units 38AH044-084 — Refer to Fig. 1 and 2 for airflow clearances. Recommended minimum clearances are 6 ft (1829 mm) for unrestricted airflow and service on sides of unit, 5 ft (1524 mm) on ends, and unrestricted clear air space above the unit. Provide ample space to connect liquid and suction lines to indoor unit. For multiple units, allow 8 ft (2440 mm) separation between units for airflow and service. Do not forklift these units unless the unit is attached to a skid designed for forklifting. Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations. Book 1 PC 111 Catalog No. 563-704 Printed in U.S.A. Form 38AH-15SI Pg 1 10-98 Replaces: 38AH-14SI Tab 3a The placement area must be level and strong enough to support the operating weight of the unit (see Table 3A or 3B). When unit is in proper location, use of mounting holes in base rails is recommended for securing unit to supporting structure. For mounting unit on vibration isolators, a perimeter support channel between the unit and the isolators is recommended. Fasteners for mounting unit are field supplied. Be sure to mount unit level to ensure proper oil return to compressors. Units 38AH094-134 — Refer to Fig. 3-6 for airflow clearances. Recommended minimum clearances are 6 ft (1829 mm) for unrestricted airflow and service on sides of unit, 5 ft (1524 mm) on ends, and unrestricted clear air space above unit. Provide ample space to connect liquid and suction lines to indoor unit. For multiple units, allow 8 ft (2...


Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias