Log:
Assessments - 3, GPA: 3.3 ( )

Instruções de Operação Oregon, Modelo EMR201A

Fabricante : Oregon
Arquivo Tamanho: 972.79 kb
Arquivo Nome : WeatherSeries_QSG.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


If installing additional sensors, make sure you assign a different channel for each sensor. Press the reset button Before placing the sensor outdoors, please verify communication with the main unit by placing the sensor next to the base unit during this setup process. 3 4 3 4 * Atomic Clock Signal Atomic clock synchronization will automatically occur after installing the batteries. Reception takes 2-10 minutes. If the signal is weak, it can take up to 24 hours to retrieve a valid signal. Please monitor atomic clock icon ( ) on the bottom part of the LCD display next to the time. This icon indicates the status of the clock reception signal. 3 Install the required number of batteries in the battery compartment located on the back of each main unit. 1 There are two types of signals the main unit will receive: Temperature Signal After installing the batteries, the main unit will automatically search for the signal from the wireless sensor. Once a temperature reading is displayed on the LCD screen, communication is now established. 2 1 2 3 Time is synchronized. Receiving signal is strong. Time is not synchronized. Receiving signal is weak. * A WEATHER THN132N Temperature Sensor 1. RAIN AND TEMPERATURE STATION Rain Collector1. Screws (Type C) 3. Washers 6. Filter1. Main Unit1. WEATHER THGR122NR Temperature/ Humidity Sensor 1.Main Unit1. Main Unit1. 500100-400THN132N Temperature Sensor 1. D SET-UP RAIN GAUGE PLACE WIRELESS E SENSOR OUTSIDE Contact our Customer Service Department for additional questions: website: www2.oregonscientific.com/service phone: 800.853.8883 (voice) address: 19861 SW 95th Avenue, Tualatin, OR 97062 Tilt the tipping funnel on the rain gauge several times and verify a numerical reading on the base unit ( ). Numerical reading will take approximately 30-45 seconds to transmit to the main unit. Press and hold the SINCE button for two seconds. The total rainfall and today rainfall will be reset to zero. Secure the battery cover with eight screws. 6 7 8 After verifying connection to the base station, place the rain gauge outside on a level surface and place a few drops of water on the cross at the base of the funnel to check the horizontal level. Water will pool to the center of the cross when the rain gauge is level. You can adjust the level when securing the rain gauge on the level screws by using the mounting screws. To complete the installation, slide the hood cover on and secure with two base screws located on the bottom rim of the rain gauge. Place the filter in the cup to prevent leaves or other debris from blocking water from entering the cup. 9 10 Remove the two base screws located on the bottom rim of the rain gauge and slide the hood cover off to expose the battery compartment. Locate the battery compartment and remove the eight screws that secure the cover. Install two AA batteries. Remove the packing tape from the tipping funnel. 1 2 3 Press the RESET button. Press the SEARCH button on the main unit to initiate a wireless sensor search. Before proceeding to install the rain gauge outside, please verify communication to the main base station. 5 4 1 3 2 6 8 10 9 4 FOR THE RAIN AND TEMPERATURE STATION 5 7 2 * Find a location ...

Este manual também é adequado para os modelos :
Estação Meteorológica - EMR201A (972.79 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias