RECEIVING...................................................................................................2 2. SPECIFICATIONS.........................................................................................3 3. INSTALLATION.............................................................................................4 3.1. ELECTRICAL....................................................................................................................................4 3.2. PLUMBING.......................................................................................................................................4 4. GLC FLOW DIAGRAM..................................................................................4 5. OPERATION..................................................................................................6 5.1. FILLING THE WASH TANK...............................................................................................................6 5.2. OPERATING INSTRUCTIONS.............................................................................................................6 3.2.1. Proper Chemical Dosage........................................................................................................6 5.3. CLEANING INSTRUCTIONS...............................................................................................................7 3.3.1. Daily Cleaning Instructions..........................................................................................................7 3.3.2. Weekly Cleaning Instructions.......................................................................................................7 6. MAINTENANCE.............................................................................................8 6.1. TROUBLESHOOTING.........................................................................................................................8 7. ELECTRICAL DIAGRAM............................................................................10 1. Receiving 1. Remove the packing material from the top of the conveyor stack. 2. Remove all packing material and tape securing components within the machine. Check that both trays are positioned properly. 3. Check for the following component parts: A. Check that the deflector screen is secure in the rinse drain. B. Check the position of the GL-C curtain. C. Check that the conveyor is level and the drive gear is engaged in the conveyor’s outer rim grooves. D. Check that overflow drain tube is in position in detergent tank. E. Check that the detergent tank screen in the detergent tank is in position. F. Check that the drain screen is in position. 4. Important: Read and follow up instructions completely. 2. Specifications WATER CONSUMPTION HOT WATER INITIAL FILL 3 GAL. 11.35 L. HOT WATER PER HOUR (max) 12 GAL. 45.42 L. COLD WATER PER HOUR 168 GAL. 636 L. OPERATING CAPACITY (2-1/2”) GLASSES PER HOUR 1000 - WATER REQUIREMENTS COLD WATER INLET 1/2” - HOT WATER INLET 1/2” - DRAIN CONNECTION 1-1/2” - TEMPERATURES INLET COLD WATER 75 °F 24°C INLET HOT WATER (recommended) 140°F 60°C FRAME DIMENSIONS DEPTH 25-1/8” 63.8CM WIDTH 25-1/4” 64CM HEIGHT 39”-40” 99.1-101.6CM MAX CLEARANCE FOR GLASSES 10” 25.4CM ELECTRICAL 240 VAC 15 AMPS TANK HEATER (Not Booster Heater) 3KW WASH PUMP MOTOR .1HP SHIPPING WEIGHT GL-C (Approximate) 156# 71 kg 3. Installation 3.1. Electrical* A 15 Amp, 240 Volt, 60 Hz dedicated circuit should be used to supply electrical power to the GL-C machine (see specification sheet page 2). The power connection with the leads L-1,L-2 and Ground must be such that there is sufficient length of flexible conduit to permit the machine to be moved for cleaning. This machine operates from 208 to 240 Volts. 3.2. Plumbing* Hot Water Connection 1. Connect a minimum 1/2” water line to the hot water solenoid valve. Supply temperature must be minimum 140°F/60°C,with flow pressure between 25-95 PSI. 2. Hot water consumption is approximately 12 U.S. gph. Cold Water Connection 1. Connect a minimum 1/2” water line to the cold water solenoid valve. Flow pressure must be between 25-95 PSI. 2. Open ball valve located between hot and cold solenoid valves until temperature reaches 75°F for areas with very cold rinse water to heat the rinse water which will prevent glasses from cracking. 3. Cold water consumption is approximately 2.8 U.S. gpm. Drain Connection 1. Connect a 1-1/2” drain line where indicated. 2. PVC pipe is generally recommended, as copper is prone to attack by the sanitizing chemicals. *Electrical and plumbing connections must be made by a qualified person who will comply with all available Federal, State, and Local Health, Electrical, Plumbing and Safety codes. 4. GLC Flow Diagram 5. Operation 5.1. Filling the Wash Tank • Ensure that the overflow drain tube is in place in the detergent tank. • Flip power on-off/flush switch to the “ON” position. The water will fill until the proper level is reached then turn the heating ele...