|
Facilidade de uso
• The MD18-2 model is a two door chemical sanitizing rack glasswashing/warewashing machine. (specify front to back or side-to-side operation) Accessories • RS19-24 - 19" wide rack stand with 24" high drain board • RS19-30 - 19" wide rack stand with 30" high drain board • RS25-24 - 25" wide rack stand with 24" high drain board • HS1930 - 19" wide hand sink with scrap basket (30" high) Options • P/N 0709242 - Cycle Counter • P/N 0709241 - Remote cycle switch • Racks - Peg, Flat, Glass GENERAL Electrical Power Requirements Booster Machine Power Requirement Model Voltage Rise Full Load Amp (125% Service Factor) MD18-1 115/60/1 N/A 12 15 MD18-2 115/60/1 N/A 12 15 NOTE: All machines come with a 5 Foot cord and plug. Standard 15 amp receptacle required. 4 J5 INSTALLATION INSTALLATION Unpacking WARNING: Care should be taken when lifting the machine to prevent damage. 1. ! Immediately after unpacking your machine, inspect for any shipping damage. If damage is found, save the packing material and contact the carrier immediately. 2. Remove the glasswasher from the skid. Adjust the feet if required, then move the machine to its permanent location. 3. Level the machine (if required) by placing a level on the top of the machine and adjusting the leveling feet. Level the machine front-to-back and side-to-side. ! CAUTION: After locating your machine, it must meet local health codes. Electrical Connections WARNING: !! Electrical and grounding connections must comply with the National Electrical Code and/or Local Electrical Codes. WARNING: When working on the glasswasher, disconnect the electric service and tag it to indicate work is being done on that circuit. 1. The electrician should compare the electrical specifications on the machine to the electrical power supply before connecting the machine to the incoming service at a fused disconnect switch. 2. Your machine is already equipped with a 5-foot/1.5m power cord and plug suitable for 115V-15A service. J5 5 INSTALLATION Plumbing Connections CAUTION: ! Plumbing connections must comply with local sanitary and plumbing codes. Water Connections 1. Connect the hot water supply (140oF/60oC Min) to the fill solenoid valve (located behind the front panel). The fill solenoid valve is equipped with a flow control that will accept water pressures from 20 psi to 70 psi. 2. Install a manual shut-off valve in the water supply line to accommodate servicing the machine. The shut-off valve should be the same size or larger than the supply line. 3. The fill solenoid valve is equipped with a built-in strainer to protect from particles in the water supply. Drain Connections 1. Your Moyer Diebel glasswasher is supplied with a flexible 5/8" I.D. drain hose, which must be connected to a 1-1/2" drain using a wye (Y) fitting. Additional drain hose may be purchased from a Moyer Diebel parts distributor. Detergent 1. Use a qualified detergent/chemical supplier for your detergent, rinse aid, and chemical sanitizer needs. 2. Your machine is supplied with a chemical dispensing system that is internally wired and ready for use. Insert the labeled Chemical pickup tubes into the correct containers. The pickup tubes have a strainer on the end to prevent crystallized chemical from clogging the supply lines. 3. The cycle timer located in the main control cabinet is equipped with adjustable cams for the chemical dispensing pump(s). The cams control the length of time that the pumps operate. A qualified person should adjust the cam settings if necessary. Refer to the timer chart diagram(s) at the end of the manual for timer cam locations and factory time settings. NOTE: A nonchlorinated, nonfoaming commercial detergent is recommended for your glasswasher. Rinse Aid 1. Using a liquid rinse aid, insert the labeled Rinse Aid pickup tube into the rinse aid container. Chemical Sanitizer 1. Using a 5.25% or 8.4% sodium hypochlorite solution, insert the labeled Chemical Sanitizer pickup tube into the chemical sanitizer container. 2. Contact your chemical supplier for adjustment of the chemical sanitizer. INSTALLATION Completing Installation 1. Remove any foreign material from inside the machine. 2. Check to assure scrap basket and sump cover are in place. 3. After plumbing and electrical connections are completed, check the machine for water leaks by depressing the ON/FILL switch on the front panel, then close and latch the door(s). This allows the tank to fill and to complete the rinse cycle. Check for leaks. 4. Open the door and check the water level. Water level should be at bottom of scrap screen. 5. Depress the OFF/DRAIN switch, close door, push start switch to drain the tank. This allows the machine to complete the wash and drain cycle. Check the drain plumbing for leaks. 6. Installation is now complete. Front Sideof TankIndicates where properwater level should appearin the inlet chute area. OPERATION OPERATION Operation Summary The following is a summary of your Glasswashing Machine operating cycle: 1. The cy...
Este manual também é adequado para os modelos :Máquinas de lavar louça - MD18-2 (815.37 kb)