Log:
Assessments - 4, GPA: 3.3 ( )

Instruções de Operação GE Monogram, Modelo ZTD910

Fabricante : GE Monogram
Arquivo Tamanho: 93.47 kb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



por este dispositivo também tem outras instruções :

Facilidade de uso


– There is no way to level the drawer once it has been installed. Be sure supports are level. • The entire weight of the drawer is supported by the runners or solid floor and must be capable of supporting 150 lbs. 9" 2x4 or 2x2 Runners or Solid Bottom Install 2x4 or 2x2 Anti-Tip Block Against RearCabinet Wall 9" From Floor to Bottom of Block Step 2 Install Warming Drawer • Slide left corner of the drawer into the opening. • Push power cord into the hole leading to the outlet location. Thread the cord through as drawer is being pushed back into the opening. Check to be sure power cord does not get trapped under the drawer. – If the outlet is installed inside the opening, plug the cord into the outlet. In this location, the excess power cord length should be coiled and taped to the right side of the unit. • Push the drawer back until the front flange is flush to the cabinet front. • Open the drawer fully. • Drill pilot holes through the holes in the overlaping frame, one on each corner. • Drive wood screws provided into each corner. NOTE: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram® local service in your area, call 1.800.444.1845. NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. Pub. No. 49-8937-2 Dwg. No. 164D3333P167 09-04 JR Printed in the United States ...

Este manual também é adequado para os modelos :
Outros aparelhos de cozinha - ZKD910 (93.47 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias