Log:
Assessments - 3, GPA: 4 ( )

Instruções de Operação Southbend, Modelo HEAVY DUTY COUNTERLINE HDG-36-M

Fabricante : Southbend
Arquivo Tamanho: 533.21 kb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


To avoid a negative pressure condition, return air must be brought into the room to replenish the air being removed by the ventilation exhaust fan. RETURN-AIR FANS MUST NOT BLOW DOWN ONTO THE APPLIANCE. Ventilation filters should be installed at an angle of 45° or more from the horizontal. This prevents dripping grease and facilitates collecting the run-off grease in a drip pan, usually installed with a filter. Be sure to inspect and clean the ventilation system according to the ventilation equipment manufacturer’s instructions. In case of unsatisfactory performance on any appliance, check the appliance with the ventilation exhaust fan in the “OFF” position. Do this only long enough to check equipment performance. Then turn the fan back on and let it run to remove any exhaust that may have accumulated during the test. INSTALLATION NOTICE Installation must comply with National Fuel Gas Code, ANSI Z223.1, Natural Gas Installation Code, CAN/CGA-B149.1, or the Propane Installation Code, CAN/CGA-B149.2, as applicable. These installation procedures must be followed by qualified personnel or warranty will be void. Local codes regarding installation vary greatly from one area to another. The National Fire Protection Association, Inc. states in its NFPA 96 latest edition that local codes are the “authority having jurisdiction” when it comes to installation requirements for equipment. Therefore, installations should comply with all local codes. Step 1: Unpack IMMEDIATELY INSPECT FOR SHIPPING DAMAGE All containers should be examined for damage before and during unloading. The freight carrier has assumed responsibility for its safe transit and delivery. If damaged equipment is received, either apparent or concealed, a claim must be made with the delivering carrier. Apparent damage or loss must be noted on the freight bill at the time of delivery. The freight bill must then be signed by the carrier representative (Driver). If the bill is not signed, the carrier may refuse the claim. The carrier can supply the necessary forms. A request for inspection must be made to the carrier within 15 days if there is concealed damage or loss that is not apparent until after the equipment is uncrated. The carrier should arrange an inspection. Be certain to hold all contents plus all packing material. 1. Uncrate carefully. Report any hidden damage to the freight carrier IMMEDIATELY. 2. Do not remove any tags or labels until unit is installed and working properly. Step 2: Attach Countertop Legs The appliance can be mounted in several ways: Mount it on short, countertop legs. Mount it on a stand that rests on the floor. Step 2a: Installation on Countertop Legs To install the appliance using countertop legs, do the following: 1. Locate the box of four legs shipped with the appliance (if countertop legs were ordered). 2. Raise the appliance about 6" so that the legs can be screwed into the bottom near the corners. Lift the appliance only from the ends, never from the middle! Su...

Este manual também é adequado para os modelos :
Outros aparelhos de cozinha - HEAVY DUTY COUNTERLINE HDG-24 (533.21 kb)
Outros aparelhos de cozinha - HEAVY DUTY COUNTERLINE HDG-24-M (533.21 kb)
Outros aparelhos de cozinha - HEAVY DUTY COUNTERLINE HDG-36 (533.21 kb)
Outros aparelhos de cozinha - HEAVY DUTY COUNTERLINE HDG-36-RE (533.21 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias