Log:
Assessments - 3, GPA: 3.3 ( )

Instruções de Operação Bradley Smoker, Modelo E19-310DC

Fabricante : Bradley Smoker
Arquivo Tamanho: 374.71 kb
Arquivo Nome : ef163dce.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Date Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GERAT 1ST WOCHENTLICH ZU PRUFEN. ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas. S'il y a quelque chose qui ne va pas fait un rapport immediatement. P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA TEL: 1-800-BRADLEY FAX: (262-251-5817) 114-051 Installation E19-310DC 3Bradley Corporation • 215-163DCE Rev. A; ECN 08-512 9/11/08 Installation Supplies Required: • (3) M10 floor anchors and bolts • Teflon tape and pipe sealant • Piping to 1-1/4" BSP water supply inlet and 1-1/4" BSP drain outlet on unit • Adequate supply pipe supports • Minimum 102mm (4") drain to accommodate 115 liters (30 gallons) per minute discharge for shower waste • OPTIONAL: sign-mounting hardware NOTE: Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly. Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from Bradley Corporation. Step 1: Secure base to floor 1. Install three suitable anchors (supplied by installer) for M10 bolts in the floor. 2. Bolt the base to the floor anchors using M10 bolts (supplied by installer). Step 2: Assemble components 1. Assemble the remaining unit components as shown on page 4. • Apply pipe sealant (by installer) to all male- threaded pipe joints. • Use the rubber grip pad provided or a strap wrench around pipes when tightening to prevent marring. Place the grip pad on the pipe, then put the wrench over the grip pad and turn the pipe with the wrench. • Bottom edge of the showerhead should be 2159mm (7'-1") from the floor. Step 3: Connect water supply IMPORTANT: Do not rely on Bradley’s Combination Unit to support supply piping. 1. Connect water supply piping to 1-1/4" BSP inlet on unit (piping by installer). Provide adequate supports (by installer) for supply pipe using pipe hangers or other means. 2. Connect drain piping to 1-1/4" BSP drain outlet on unit (piping by installer). 3. Hang the safety sign from the unit with the curtain hooks provided (or mount it to the wall using sign- mounting hardware by installer). Top View From Bowl 114mm (4-1/2") O 78.7mm (3.1") NOTE: All dimensions assume standard thread engagement. Variations in manufacturing allow for +/- 3mm (1/8") per threaded joint. To find the tolerance of a dimension, add the number of thread joints in between a dimension and multiply it by 3mm (1/8"). 645mm (25-3/8") 610mm (24") 2159mm (7'-1") to Floor 1676mm (66") to Floor 140mm (5-1/2") 1041mm (41") 152mm (6") O 229mm (9") Flange with (3) O 10mm (3/8") Holes on O 203mm (8") Bolt Circle 229mm (9") 247mm (9-3/4") O 273mm (10-3/4") 267mm (10-1/2") 4 E19-310DC Installation 9/11/08 Bradley Corporation • 215-163DCE Rev. A; ECN 08-512 Assembly of Components 10 P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA TEL: 1-800-BRADLEY FAX: (262-251-5817) 114-052 P.O. Box 309, Menomonee Falls, WI 53051 R TEST THIS UNIT EACH WEEK Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wochentlich im Testbetrieb prufen, bestatigt durch Unterschrift. Jegliche Storung sofort melden. Date Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GERAT 1ST WOCHENTLICH ZU PRUFEN. ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas. S'il y a quelque chose qui ne va pas fait un rapport immediatement. 22 23 1 2 3 1-1/4" BSP Drain Outlet 5 2 NOTE: If tee (Item 7) is used as a supply inlet, use plug (Item 7) on tee (Item 2). BSP threads this end HANDLE NOTE: Close the cover and put the pin through the clip to keep closed. 20 8 13 12 11 6 7 5 1-1/4" BSP Supply Inlet (BSP threads are noted with black line on threads) 9 9.5 9.11 9.4 9.1 9.2 9.3 19 16 17 18 Flow Control This End 15.1 15.2 15.3 15.4 4.4 4.11 4.3 4.6 4.8 4.7 4.71 4.9 4.10 4.12 4.2 4.1 4.5 4.2 4 4.12 21 14 14.1 NOTE: Items 8.1–8.5 come preassembled as Item 8. Items 14.1–14.12 come preassembled as Item 14. NOTE: Use teflon tape only. Installation E19-310DC Parts List Item Part No. Qty Description Item Part No. Qty Description 1 131-059 1 Base 9.2 140-720 1 Stop Bracket2 169-727B 2 Pipe Tee 1-1/4” NPT 9.3 124-048 1 Washer, Friction3 113-006LC 1 Pipe 1-1/4” NPT x 706 mm 9.4 128-129 1 Handle4 S39-226 1 Europe Eyewash Sub-Assy. 9.5 142-002DC 1 Lockwasher 4.1 111-039 1 Inlet Drain Fitting 10 128-156A 1 Pull Rod - 24” Long 4.2 169-025 2 Street Elbow 1/2” NPT 11 113-006LK 1 Pipe 1” NPT x 310 mm 4.3 S06-136 1 Plgd. Nipple 1-1/4” NPT x 76mm12 169-847 1 90° Elbow 1” NPT 4.4 169-841 1 Reducing Tee 13 151-001 2 Curtain Hook 4.5 142-002DA 1 Lockwasher 14 S24-188 1 Plastic Showerhead Assembly 4.6 169-726 1 Union 1/2” Female NPT 14.1 S24-187 1 Flow Control Assembl...


Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias