Log:
Assessments - 3, GPA: 4 ( )

Instruções de Operação Harbor Freight Tools, Modelo 94515

Fabricante : Harbor Freight Tools
Arquivo Tamanho: 721.14 kb
Arquivo Nome : 94515.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Attach the Right-hand Corner Studs (29) on the outside of the two remaining corners, also as explained below. To attach the corner studs, as shown to the right: 1) slide a Hold Down Connector (55) up under the rail and over the end of the Bolt (43), then 2) secure it using a Nut (52). Use two Hold Down Connectors for each Corner Stud. 3. Place two Bolts (43) and Nuts (52) into the holes on the Top Doorway Beam (12). Do not tighten them yet. While making sure that the profiles of the parts are oriented as shown to the right, slide the slot on the Door Rail (14) over the heads of the bolts on the Top Doorway Beam. Align the right edge of the Door Rail on the Doorway Beam, then tighten the Nuts. Attach a Corner End Cap (47) to the top outer corner of each Corner Stud (1, 29).4. ( Front) (Rear) (Right) Figure A36( Left) The 8 spots requiring a Hold- down Connector (55) are marked with a plus (+). 1634341291293636131313171321+ + ++ ++ ++ 5. Attach a Side Ceiling Plate (36) flat against the inside of two Corner Studs (1,29). Make sure that the gutter on the Side Ceiling Plate is oriented correctly, see Figure A inset. At this point, the completed section of the frame will likely need support. Attach the second Ceiling Plate the same way. Attach a Corner Bracket (13) at the 6. inside top of each Corner Stud (1,29) so that the bracket faces upwards, see diagram to the right. Leave the upper holes of the two rear Corner Brackets (13) empty to allow the rear brace to be attached to those holes in the next step. Attach the Rear Brace (21) to the 7. inside of the two Corner Brackets (13) that are over the Rear Floor Plate (16). The flange on the Rear Brace should face inward. Attach each end to the upper hole on the Corner Bracket (13). (See Figure A.) 1412 Assembling the Roof Frame Figure B2345351214 1. Assemble the roof frame to the side of the greenhouse first. Attach the Front-Right and Front-Left Crown Beams (2, 3) to the outside of the Crown (35) with the angled edges towards the top. See diagram below right, viewed from under the Crown, facing forward. Attach the Top Doorway Beam (12) and Door Rail (14) 2. assembly to the outside (opposite the Crown) of the Front- Right and Front-Left Crown Beams (2, 3). The rounded edge on the Door Rail should face upward. Attach the Rear Crown Beams (4,5) to the Crown (35) in 3. the same fashion as the Front Crown Beams in step 1. Attach a Corner End Cap (47) onto the outer end of each 4. Crown Beam (2-5). Cover the gaps between the Crown Beams (between 2-3 & 4-5) with a Peak Cap (54) in each. You may desire to use some silicone (not included) to secure the Peak Caps (54) in place. With an assistant, lift the Crown Assembly and place the Crown Beams (2-5) on 5. top of the Corner Brackets (13). (See Figure B.) Secure each corner in place with the Crown Beams on the outside of the Corner Brackets. Assembling the Studs and Braces The 8 spots requiring a Hold-down Connector (55) are marked with a plus (+). Figure C+ + + + + + + + 1998222210102525232367192338339Viewed from other angle 1. Attach the Rear-Left and Rear-Right Studs (8, 9) to the outside of the Rear Floor Plate (16) and Rear Brace (21). Slide a Hold-Down Connector (55) under the base and over the Bolt at each Floor Plate (16) connection. Attach the tops of the Rear Studs (8, 9) to the Rear-Right and Rear-Left Crown 2. Beams (4, 5). Attach a Side Stud (10) in the center of each side to the 3. outside of the frame with an extra Bolt (43) in the slot. Slide a Hold-Down Connector (55) under the base and over the Bolt at each bottom connection. Attach a Side Diagonal Brace (22) from the hole on the Side Floor Plate (34) to the 4. hole on the Side Ceiling Plate (36) on the inside as shown in Figure C. The flange on the Brace should face inward. Attach the center hole of the Brace to the Bolt (43) in the center of the Side Stud (10). Attach the other Side Diagonal Brace (22) to the other side in the same manner as the first. View from aboveToCorner Stud (1) Left Doorway Stud (6) Front Floor Plate (17) ToCorner Stud (29) Right Doorway Stud (7) 5. Install the Left and Right Doorway Studs (6, 7) to the outside of the frame so that they rest flat against the frame. Their orientation should be the same as shown above. Slide a Bolt (43) into each slot for later Front Brace (23) assembly. Slide a Hold-Down Connector (55) under the base and over the Bolt at each bottom connection, do not secure with a Nut (52) until the next step. Remove the bottom Bolt from the Corner Brackets (13) at the front of the greenhouse. 6. Install the Front Diagonal Braces (25) with their flanges facing inward to the bottom hole of the Brackets on the inside using Bolts (43). Attach the bottom of the Front Diagonal Braces (25) to the Bolt left exposed on the Floor Plate (17) from the last step. (See Figure C.) Remove next bolt up from the front Corner Brackets (13). Connect the Front Braces 7. (23) to the exposed hole. Connect the loose ends of the Front B...


Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias