Log:
Assessments - 1, GPA: 5 ( )

Instruções de Operação Panasonic, Modelo EY6813-U1

Fabricante : Panasonic
Arquivo Tamanho: 371.17 kb
Arquivo Nome : ey6813-u1.big.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Unauthorized copying and distribution is a violation of law. EY6813-U1 1 SCHEMATIC DIAGRAM 2 WIRING CONNECTION DIAGRAM 2 EY6813-U1 3 DISASSEMBLY/ASSEMBLY INSTRUCTIONS HOW TO DISASSEMBLE THE MAIN UNIT. Ref. No. 1A Procedure 1A Removal of the housing. 1. Set the hammering/drilling switching lever to the position and the speed/blow mode selection lever in between "H" and "S" position. 2. Loosen the support handle and take it out from the unit. 3. Pluck the chuck cover depressing the chuck handle. 4. Remove 15 housing screws. For assemblingNOTE : Make sure to attach the dust preventive clothes or filters on the housings. Ref. No. 1B Procedure 1A> >>>> 1B Removal of the motor brush assembly. 1. Loosen 2 screws. 3 EY6813-U1 HOW TO DISASSEMBLE MAIN UNIT. Ref. No. 2A Procedure 1A> >>>> 1B> >>>> 2A Removal of the switch. 1. Take out the heat sink from the housing by something like a plier. 2. Take out the battery holder from the housing. 3. Remove the trigger cover. For assemblingNOTE: Make sure to set the trigger cover into the groove of housing. Ref. No. 2B Procedure 1A> >>>> 1B> >>>> 2A> >>>> 2B Removal of the motor assembly. 1. Hitch the brush spring to the frame by something like a forceps and take the motor brush assembly with the switch out from the motor assembly. 2. Take out the rotor and the current plate from the motor case. For assemblingNOTE: Make sure to return the spring into the groove of the motor brush. Make sure to align the groove of motor case and the groove of current plate. And set the largest groove of the motor case onto the boss of housing. 4 EY6813-U1 HOW TO DISASSEMBLE THE GEAR BOX BLOCK. Ref. No. 2C Procedure 2A > >>>> 2B > >>>> 2C Removal of the gear box block. 1. Loosen 8 screws of the gear case. 2. Take out a steel ball pushing the chuck spring with the chuck spring plate. 3. Remove the chuck spring, the chuck spring plate and the spindle & piston assembly. 4. Remove the intermediate shaft assembly. For assemblingNOTE : Every time the gear box block is opened, use the new gaskets and screws. 1. Assemble the bearing with the spindle assembly. 2. Fit O-ring onto the bearing. It is little loose. 3. Assemble the chuck spring and the chuck spring plate. 4. Insert a ball pushing down the chuck spring. 5.Insert the reciprocation bearing shaft into the hole of universal coupling. Make sure two thrust plates should be set both side of reciprocation bearing shaft one of each. NOTE : Greasing about 30g into the gear box block especially for the connection area between reciprocation bearing and universal coupling. In addition, hammer O-ring, inside of piston and cylinder for output shaft block also need to apply. Air compressed by the piston drives hammer. Take care to protect the piston and hammer from contamination by dust. 5 EY6813-U1 4 TROUBLESHOOTING GUIDE (Refer to WIRING CONNECTION DIAGRAM) 4.1. CHECK POINTS FOR ELECTRICAL PARTS. < TROUBLE > < CHECK > < REMEDY > Does not operate. NO Replace battery > If no less than 24V DC is available across the (+) and (-) > pack. terminals after charging the rated charging time (45min.), the battery pack is OK. NOTE: The battery pack is sold separately as an optional accessory. See the nearest sales dealer for details. The battery pack has a limited life. The pack should be replaced if; -after being charged for the rated charging time the battery voltage is less than 24V DC or the usable time is extremely short. -the battery leaks. Check battery for leaks and terminals for corrosion. vOK > replace switch Check for proper terminal contacts or if there is any foreign assembly. substances around the battery terminals of battery holder. vOK NO Replace motor The motor normally operates with its white (+) and gray (-) > rotor and brush lead wires connected to 24V DC. assembly. Does not speed NO Replace switch & control but switch > Even if FET block is defective, it can not be replaced > FET block. trigger works individually. Replace whole switch block. properly. 6 EY6813-U1 4.2. CHECK POINTS FOR MECHANISM BLOCK. < TROUBLE > Does not hammer or weakness of hammering. > < CHECK > Check the wear condition of the change clutch and spring. NO > < REMEDY > Replace intermediate shaft assembly. vOK Check the smooth action between reciprocation bearing and universal coupling. NO > Replace universal coupling. vOK Check the wear condition of inside of piston and hammer O-ring. NO > Replace piston assembly and greasing. vOK Check the smooth action of striker. NO > Replace spindle assembly. vOK Check the wear condition on tooth for change gears. NO > Replace intermediate shaft assembly. Does not drill. > Check the condition of bearing for H/D handle. NO > Replace H/...


Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias