Log:
Assessments - 3, GPA: 4 ( )

Instruções de Operação Premier Mounts, Modelo GB-PIPE1B

Fabricante : Premier Mounts
Arquivo Tamanho: 785.44 kb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Determine where the GB-PIPE1 will be located. Step 2. Install your 1-1/2” NPT or ceiling adapter. Step 3. Attach the upper plate to the NPT or adapter by rotating counter-clockwise. Step 4. Use an M3 security wrench to tighten the set screw. Upper Plate Step 5. At this time, run all existing cables through the pipe and down through the upper plate. The GB-PIPE1 is designed for use with either a standard piece of 1-1/2” NPT pipe or any available ceiling mount adapter from Premier Mounts. Please refer to the ceiling mount adapter installation instructions when mounting. GB-PIPE1 Unpack the Gear Box and review any WARNING statements that apply to the installation. Select the desired location for the GB-PIPE1. The upper plate must rotate onto the threads at least four (4) complete rotations. 1-1/2” NPT Set Screw M3 Security Wrench Pipe Cables At this time, you may pre-install your electronic components in the equipment tray. Electronic Component Installation Instructions Page 5 GB-PIPE1 Mounting Hole Spring Loaded Nuts Step 6. Lift the equipment tray into position. Upper Plate Step 7. Line up the mounting holes with the threaded shaft of the spring loaded nuts. Step 8. Once the holes are lined up, press down on the spring loaded nuts and tighten. Step 9. Insert and tighten two (2) M4 x 10mm security screws on the upper plate. Electronic Components 1-1/2” NPT Installation The NPT must rotate onto the equipment tray four (4) complete rotations. Step 2. Use an M3 security wrench to tighten the set screw. Step 3. Attach projector mount to NPT. 1-1/2” NPT 1-1/2” NPT Equipment Tray Set Screw Step 1. Place the threaded end of the 1-1/2” NPT into the plate hole. Plate Hole Before attaching the lower 1-1/2” NPT, it is strongly recommended that all connections in the equipment tray be made at this time. Once the connections are made, feed the cables through the plate hole and then through the 1-1/2” NPT. Please read instructions below to complete the installation. M4 x 10mm Security Screws Please follow the instructions included with the mount to complete this step. If using a PDS Series mount, connection may be made directly to the bottom of the equipment tray. Page 6 Installation Instructions GB-PIPE1 PDS-PLUS Installation without NPT (Optional) Before attaching the PDS-PLUS, it is strongly recommended that all connections in the equipment tray be made at this time. Once the connections are made, feed the cables through the plate hole and then through the 1-1/2” NPT. Please read instructions below to complete the installation. M5 Security Wrench M8 x 12mm Security Head Screw Equipment Tray Step 1. Remove the lower mounting plate from the equipment tray by removing the four (4) M8 x 12mm security head screws with an M5 security wrench. Mounting Slots Step 2. Locate the mounting slots that are on the base box bridge of the PDS-PLUS. Base Box Bridge Step 3. Line up the mounting slots on the base box bridge with the mounting points on the equipment tray. Step 4. Insert four (4) M5 x 10mm security screws and tighten using the M5 security wrench. M5 Security Wrench M5 Security Wrench Mounting Point Equipment Tray M5 x 10mm Security Head Screw Equipment Tray Base Box Bridge Base Box Bridge Please refer to the PDS-PLUS Installation Instructions before proceeding with the following steps. M5 x 10mm Security Head Screw Be aware of the screen location and orient the base accordingly. Installation Instructions Page 7 GB-PIPE1 Cable Connections Equipment Tray Step 1. Pull all cables down through the PDS-PLUS base box. Please refer to the PDS-PLUS Installation Instructions before proceeding with the following steps. Cables PDS-PLUS Base Box Step 2. Pull all cables down through the PDS-PLUS projector plate. Step 3. Attach all cables to the installed projector. Step 2. Tighten these screws using the M5 security wrench. M3 Security Wrench Side Panel M4 x 8mm Security Screw Step 1. Attach the two side panels using eight (8) M4 x 8mm security screws. Side Panel Installation Side Panel Side Panel Cables Page 8 Installation Instructions Technical Specifications All measurements are in inches(mm). GB-PIPE1 Lateral Shift Adjustment M8 x 12mm Security Head Screw M5 Security Wrench Step 1. Use the M5 security wrench and loosen the four (4) M8 x 12mm security screws. Step 2. Once the screws have been loosened, slide the GB-PIPE1 laterally side to side (or front to back). Step 3. When the desired position has been determined, use the M5 security wrench to tighten the M8 x 12mm security screws. Do not completely remove these screws. GB-PIPE1 Warranty PREMIER MOUNTS LIMITED LIFETIME WARRANTY What and Who is Covered by this Limited Warranty and for How Long Premier Mounts warrants this product to be free from defects in material and workmanship for the lifetime of the original owner of this product. The limited warranty is valid only for the original purchaser of the product. What Premier Mounts Will Do At the sole option of Premier Mounts, Premier...

Este manual também é adequado para os modelos :
Projetores - GB-PIPE1 (785.44 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias