Fabricante : American Standard
Arquivo Tamanho: 2.32 mb
Arquivo Nome : prgh0077.pdf
|
Facilidade de uso
24 kW and 29 psi flow pressure before the Shower panel. Only one consumer possible, not two simultaneously. Pressure differences: The pressures of the cold and hot water connections must be balanced. Maintenance The non return valves must be checked regularly according with national or regional regulations (at least once a year!). * Check applicable codes The flow rates are limited to .5 gpm. These are the maximum flow rates permitted by the From • the function is guaranteed. Fitting Items / Water Connections Overview Wall Installation 7 Seal all drill holes with silicone free from acetic acid (not in scope of delivery) Fitting items / water connections wall installation Before drilling the bottom holes pay attention if hot and/or cold water supply pipes cross this area. In this case, only drill on the side without any supply pipes. Dimensions The installation dimensions stated in this installation instructions are ideal for people of approximately 70" in body height. The dimensions can be altered if required. In this case you will have to attend to the minimum height of 87" from shower tray floor, and alter all the required measurements as necessary. If the height of water connection are outside of the illustrated range, the drill measures have been adjusted accordingly. (attention for minimum room height of 87 from tub-floor) Flush through the supply pipes. SW 0 mm SW mm O 0 mm O8 mm SW 24 mm 1 2 1. 2. 1. 2. Wall Installation 3 4 SW 13 mm SW 2 mm Wall Installation Adjustment Thermostatic mixer please see page 14 Fitting Items / Water Connections Overview Corner Installation 0 2x 2x 2x1x Seal all drill holes with silicone free from acetic acid (not in scope of delivery) Fitting items / water connections corner installation Before drilling the bottom holes pay attention if hot and/or cold water supply pipes cross this area. In this case, only drill on the side without any supply pipes. Dimensions The installation dimensions stated in this installation instructions are ideal for people of approximately 70" in body height. The dimensions can be altered if required. In this case you will have to attend to the minimum height of 87" from shower tray floor, and alter all the required measurements as necessary. If the height of water connection are outside of the illustrated range, the drill measures have been adjusted accordingly. (attention for minimum room height of 87 from tub-floor) Flush through the supply pipes. SW 5 mm O mm SW 0 mm O mm SW mm 11 1 2 3 Corner Installation 12 4 5 SW 24 mm 1. 2. 1. 2. Corner Installation 13 6 7 SW 13 mm SW 17 mm Corner Installation Adjustment Thermostatic mixer please see page 14 14 A 1 2 3 4 5 6 7 Thermostat Setting / Safety Function Thermostat Setting (6-7) - Set Quattrostat to "Hand shower". - Open Quattrostat, adjust thermostat to 100 °F. - Push thermostat grip on and align vertically (red button A points upwards), screw tight Safety Function (1-5) The desired maximum temperature for example max. 108 °F can be pre-set thanks to the safety function 15 8" (150 N) Trouble Shooting Fault Cause Remedy water level is too low filter in angled hose connection is dirt clean filter handshower delivering insufficient water filter of handshower dirty clean filter temperature regulation not possible (only hot thermostatic cartridge defective exchange thermostatic cartridge or cold water) at new installation: connection hose exchanged install connection hose correct shower is dripping cartridge of Quattrost...
Este manual também é adequado para os modelos :Canalização - Pharo DP Lift 2 M 20 (2.32 mb)
Canalização - Pharo DP Lift 2 M 20 (2.32 mb)
Canalização - Pharo DP Lift 2 M 20 (2.32 mb)