Log:
Assessments - 3, GPA: 4.3 ( )

Instruções de Operação Delta, Modelo PORTSMOUTHTM 7420.9

Fabricante : Delta
Arquivo Tamanho: 369.46 kb
Arquivo Nome : Install_4240.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Make certain SET SCREW (4) is properly aligned and tight so that SPOUT (1) is locked in place. 6 1 2 3 7 5 8 10 9 9 9 11 1 4 3 2 4 6 6 5 7 VIEW "A" VIEW "A" 7 MAKE WATER SUPPLY CONNECTIONS 8 9 7A With HANDLES in OFF position, turn on WATER SUPPLIES and check all connections for leaks. Operate both HANDLES to flush water lines thoroughly. Connect HOT water supply to LEFT INLET UNION (1) and COLD water supply to RIGHT INLET UNION (2). Pipe connections are 3/4" NPT. Use sealant or Teflon tape on pipe connections. Do not solder directly to valve body. TEST INSTALLED FAUCET 3/4" X 3/4" NPT UNION (NOT SUPPLIED) HOT COLD 3/4" NPT HAND SHOWER TRANSFER KNOB 3/4" NPT 2 1 Lift HAND SHOWER from HOLDER, direct spray into tub. Lift TRANSFER KNOB to check HAND SHOWER and HOSES for leaks. Turn handles "off" and replace HAND SHOWER. IMPORTANT: It is strongly recommended that access be provided for all enclosed mechanical parts to this system. M965027 REV.1.6 DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL CLOTH. DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS, OR A CLOTH WITH A COARSE SURFACE. CARE INSTRUCTIONS: ...

Este manual também é adequado para os modelos :
Canalização - PORTSMOUTHTM 7420.921 (369.46 kb)
Canalização - PORTSMOUTHTM 7420.901 (369.46 kb)
Canalização - PORTSMOUTHTM 7420.9 (369.46 kb)
Canalização - PORTSMOUTHTM 7420.901 (369.46 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias