Log:
Assessments - 2, GPA: 3.5 ( )

Instruções de Operação ADC, Modelo Enterprise Reporter HL-002-002

Fabricante : ADC
Arquivo Tamanho: 3.17 mb
Arquivo Nome : 6a5a1a3c-4a16-46b4-80e7-a412687d421e.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Access space provided so the server power cord can be unplugged from the power supply or the wall outlet—this is the only way to remove the AC power cord from the server. Clearance provided for cooling and airflow: Approximately 30 inches (76.2 cm) in the back and 25 inches (63.5 cm) in the front. Located near a properly earthed, grounded, power outlet. Rack Mount the Server Rack Setup Precautions Warning: Before rack mounting the server, the physical environment should be set up to safely accommodate the server. Be sure that: The weight of all units in the rack is evenly distributed. Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading. The rack will not tip over when the server is mounted, even when the unit is fully extended from the rack. For a single rack installation, stabilizers are attached to the rack. For multiple rack installations, racks are coupled together. Reliable earthing of rack-mounted equipment is maintained at all times. Particular attention should be given to supply connections other than direct connections to the branch circuit (e.g. use of power strips). A power cord will be long enough to fit into the server when properly mounted in the rack and will be able to supply power to the unit. The connection of the server to the power supply will not overload any circuits. Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern. The server is only connected to a properly rated supply circuit. Reliable earthing (grounding) of rack-mounted equipment should be maintained. The air flow through the server’s fan or vents is not restricted. Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised. The maximum operating ambient temperature does not exceed 104°F (40°C). If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (Tma) specified by the manufacturer. WARNING: Extend only one component at a time. Extending two or more components simultaneously may cause the rack to become unstable. Rack Mount Instructions for HL Servers Rack Setup Suggestions Determine the placement of each component in the rack before you install the rails. Install the heaviest server components on the bottom of the rack first, and then work up. Identify the Sections of the Rack Rails You should have received two rack rail assemblies with the 8e6 server unit. Each of these assemblies consists of two sections: An inner fixed chassis rail that secures to the unit (A), and an outer fixed rack rail that secures directly to the rack itself (B). Two pairs of short brackets to be used on the front side of the outer rails are also included. Install the Inner Rails Both the left and right side inner rails have been pre-attached to the chassis. Proceed to the next step. Install the Outer Rails Begin by measuring the distance from the front rail to the rear rail of the rack. Attach a short bracket to the front side of the right outer rail and a long bracket to the rear side of the right outer rail. Adjust both the short and long brackets to the proper distance so that the rail can fit snugly into the rack. Secure the short bracket to the front side of the outer rail with two M4 screws and the long bracket to the rear side of the outer rail with three M4 screws. Repeat these steps for the left outer rail. Locking Tabs: Both chassis rails have a locking tab, which serves two functions. The first is to lock the server into place when installed and pushed fully into the rack, which is its normal position. Secondly, these tabs also lock the server in place when fully extended from the rack. This prevents the server from coming completely out of the rack when you pull it out for servicing. Install the Server into the Rack You should now have rails attached to both the chassis and the rack unit. The next step is to install the server chassis into the rack. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting). When the server has been pushed completely into the rack, you should hear the locking tabs “click.” Install the Server into a Telco Rack If you are installing the 8e6 server unit into a Telco type rack, use two L-shaped brackets on either side of the chassis (four total). First, determine how far follow the server will extend out the front of the ...

Este manual também é adequado para os modelos :
Equipamento de rede - Enterprise Reporter HL-002-002 (3.17 mb)
Equipamento de rede - Enterprise Reporter HL-002-002 (3.17 mb)
Equipamento de rede - Enterprise Reporter HL-022-002 (3.17 mb)
Equipamento de rede - Enterprise Reporter SL-002-002 (3.17 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias