Log:
Downloads : 11   Arquivo Tamanho: 2 mb   Fabricante : American Dryer Corp.  
Categoria : Máquinas de lavar
@name

However, a preoperational test should be performed before the dryer is publicly used. It is possible that adjustments have changed in transit or due to marginal location (installation) conditions. Turn on electric power to the dryer. Refer to the operating instructions for starting your dryer. Open all shutoff valves. When a gas dryer is first started (during initial start-up), it has a tendency not to ignite on the first ignition attempt. This is because the gas supply piping is filled with

Downloads : 27   Arquivo Tamanho: 2 mb   Fabricante : American Dryer Corp.  
Categoria : Máquinas de lavar
@name

On a call for heat, a 24 volt signal is applied to the 3-way/2-position solenoid valve. This signal switches th. valve so that compressed air is sent to the pistons. The piston rods extend, pushing the hinged steam dampe. plate to the open position. This allows room air to be drawn through the hot steam coil and then through th. tumbler (basket). When the temperature set point has been reached, the 24 volt signal is removed from the solenoid valve, so tha. the solenoid valve blocks the air suppl





categorias