Log:
Assessments - 1, GPA: 5 ( )

Instruções de Operação Samsung, Modelo DV218AEW

Fabricante : Samsung
Arquivo Tamanho: 3.9 mb
Arquivo Nome : 3289b09b-80d9-47a1-90dc-480953279512.pdf
Língua de Ensino: enfr
Ir para baixar



Facilidade de uso


It is not permissible to convert a dryer in Canada to 208 volts. installing your dryer _13 DV218AEW-02568B_EN.indd 13 2008-04-14 .AEA 2:14:04 14_ installing your dryer installing your dryer REPLACEMENT PARTS AND ACCESSORIES If your dryer requires replacement parts or accessories, contact the dealer from whom you purchased your dryer or the SAMSUNG customer care center at 1-800-SAMSUNG (726-7864). Tools and Parts Pliers Cutting knife Pipe wrench (gas only) Nut drivers Level Phillips Screwdriver Duct tape Wrench INSTALLATION Gather the required tools and parts before starting the installation. Read and follow the instructions provided with any tools listed here. For proper installation, we recommend that you hire a professional. To install: 1. Move your dryer to an appropriate location for installation. Consider installing the dryer and washer side by-side. This will allow access to gas, electrical, and exhaust connections. Lay two of the carton cushion-tops on the floor. Tip your dryer on its side so it will lay across both cushion-tops. 2. Set your dryer back in an upright position. 3. To ensure that the dryer provides optimal drying performance, it must be level. To minimize vibration, noise, and unwanted movement,the floor must be a perfectly level, solid surface. To set the dryer to the same height as the washer, fully retract the leveling feet by turning them counterclockwise, then loosen the legs by turning them clockwise Adjust the leveling feet only as much as necessary to level the dryer. Extending the leveling feet more than necessary can cause the dryer to vibrate. Level Leveling feet Retract fully Then loosen DV218AEW-02568B_EN.indd 14 2008-04-14 .AEA 2:14:08 01 installing 4. Review the Exhausting section before installing the exhaust system. Install the ductwork from your dryer to the exhaust hood. The crimped end of the duct sections must point away from your dryer. DO NOT use sheet metal screws when assembling ducting. These joints should be taped. Never use plastic flexible exhaust material. Tip for tight installations: install a section of exhaust system to your dryer before putting it in place. Use duct tape to secure this section to your dryer, but do not cover ventilation slots at the back of the unit in dryer cabinet. 5. Review Electrical Requirements section. BEFORE OPERATING OR TESTING, follow the grounding instructions in the Grounding section. U.S. MODELS: IMPORTANT – All U.S. models are produced for a 3-WIRE SYSTEM CONNECTION. The Dryer frame is grounded to the neutral conductor at the terminal block. A 4-WIRE SYSTEM CONNECTION is required for new or remodeled construction, mobile homes, or if local codes do not permit grounding through neutral conductor. If the 4-wire system is used, the Dryer frame cannot be grounded to the neutral conductor at the terminal block. Refer to the following instructions for 3- and 4-WIRE SYSTEM CONNECTIONS. Remove the terminal block cover plate. Insert the power cord with a UL-listed strain relief through the hole provided in the cabinet near the terminal block. A strain relief must be used. Do not loosen the nuts already installed on the terminal block. Be sure they are tight. Use a 3/8” (1cm) deep well socket. 6. Review Gas Requirements section. Remove the pipe thread protective cap. Apply pipe joint compound or about 1 1/2 wraps of Teflon tape over all threaded connections. Pipe joint compound must be resistant to the action of any liquefied petroleum gas. Connect the gas supply to your Dryer. An additional fitting is required to connect the 3/4” (1.9 cm) female thread end of a flexible connector to the 3/8” (1 cm) male threaded end on the dryer. Securely tighten the gas line fitting over threads. Turn on the gas supply. Check all gas connections for leaks using a soap solution. If bubbles appear, tighten the connections and recheck. DO NOT use an open flame to check for gas leaks. installing your dryer _15 DV218AEW-02568B_EN.indd 15 2008-04-14 .AEA 2:14:09 installing your dryer WARNING 3-WIRE system connections 1. Loosen or remove the center terminal block screw. 2. Connect the neutral wire (white or center wire) of the power cord to the center, silver-colored terminal screw of the terminal block. Tighten screw. 3. Connect the other wires to outer terminal block screws. Tighten screws. 4. Tighten the strain relief screws. 5. Insert the tab of the terminal block cover into your Dryer’s rear panel slot. Secure the cover with a hold-down screw. 1. External ground connector 2. Neutral grounding wire (green/yellow) 3. Center silver-colored terminal block screw 4. Neutral wire (white or center wire) 5. 3/4” (1.9 cm) UL-listed strain relief If converting from a 4-wire electrical system to a 3-wire, the ground strap must be reconnected to the terminal block support to ground the Dryer frame to the neutral conductor. 4-WIRE system connections 1. Remove the center terminal block screw. 2. Connect the ground wire (green or unwrapped) of the power cord to the...

Este manual também é adequado para os modelos :
Secadores - DV218AGW (3.9 mb)
Secadores - DV218AGB (3.9 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias