|
Instruções de Operação Hansol Multitech, Modelo Uromat 3000
Fabricante : Hansol Multitech Arquivo Tamanho: 3.45 mb Arquivo Nome : b190cfa9-82dc-4957-9a80-20ee0e764c9e.pdf
Língua de Ensino:
|
|
|
|
Ir para baixar
Facilidade de uso
1 D-91056 Erlangen ALL RIGHTS RESERVED Ru INSTALLATION INSTRUCTIONS Uromat 3000 ________________________________________________________________________ ________________________________________________________________________ English Version CONTENTS Page 1. Technical Data 1.1 General Safety Information 4 1.2 Component Weights 4 1.3 Component Dimensions 4 1.4 Packaging Dimensions and Weights 4 1.5 Component Designations 5 1.6 Dimensional Drawing 6 1.7 Cable Lengths of the High Voltage, Collimator, Adjustable Bucky and Image lntensifier Cables 10 1.8 Power Line Connection Data 11 1.9 Required Special Tools 11 1.10 Required Test Equipment 11 1.11 Environmental Conditions 11 1.12 Operating Conditions 11 1.13 Circuit Diagram Overview 12 1.14 Component Designations for the Circuit Diagram 27 1.15 Function Description of the Controller 31 2. Installation 2.1 Preparations for Installation 35 2.2 Unpacking the Unit Parts 35 2.3 Taking the Unit Off the Pallet 36 2.4 Installing the Unit 37 2.5 Aligning the Unit 38 2.6 Temporarily Connecting Line Power 39 2.7 Installing the Tube Unit Support Arm 39 2.8 Preinstallation of the Tube Unit - Collimator 40 2.9 Installing the Tube Unit - Collimator on the Tube Unit Support Arm 40 2.10 Installing the Image Intensifier (I.I.) 41 2.11 Laying the Collimator Cables 41 2.12 Laying the High Voltage Cables 42 2.13 Laying the I.I. Cables 44 2.14 Connecting the Power Supply via the Generator 44 2.15 Installing the Measuring Chamber 45 2.16 Installing the Grid 46 2.17 Installing the Tilt Angle Indicator - Error Display 46 2.18 Installing the Cover Panels 47 2.19 Installing the Monitor Support Arm 47 2.20 Installing the Holder for the Flush Bowl 47 2.21 Sealing the Table Frame Cover Panel 48 0116 7201 -2 of 90 Rev. 00 © 2000 Hans Pausch Rontgengeratebau Graf-Zeppelin-Str. 1 D-91056 Erlangen ALL RIGHTS RESERVED Ru 3. Adjustments 3.1 Installing the Tube Unit Support Arm 48 3.2 Central Beam to Center of Bucky 50 3.3 Central Beam to Center of I.I. 50 3.4 Tabletop, Longitudinal Movement Path Potentiometer 51 3.5 Tabletop, Transverse Movement Path Potentiometer 52 3.6 Bucky Movement Path Potentiometer 52 3.7 I.I. Carriage Movement Path Potentiometer 52 3.8 Table Tilt Movement Path Potentiometer 1 53 3.9 Table Tilt Movement Path Potentiometer 2 53 3.10 Table, Longitudinal Safety Switches 54 3.11 Tabletop, Transverse Safety Switches not configured 54 3.12 Tabletop, Longitudinal Safety Switches 55 3.13 I.I. Carriage Movement Path Safety Switches 55 3.14 Table Tilt Up Movement Path Switch Strike Plate 55 3.15 Table Tilt Down Movement Path Switch Strike Plate 55 3.16 +88° Tilt Movement Safety Switches 56 3.17 -20° Tilt Movement Safety Switches 56 3.18 Spindle Nut Safety Switches 56 3.19 Accessory Sensor Switches 57 3.20 Longitudinal Tabletop Belt Tension 57 3.21 Raise - Lower Table Belt Tension 57 3.22 Cassette Carriage Drive Belt Tension 58 3.23 Operation in the Service Mode 59 3.24 Startup 61 3.25 Collimator Basic Setting 62 3.26 Collimation to Cassette and I.I. Formats 63 3.27 Saving the Parameters in the PC 64 3.28 Setting Parameters - Electronics 65 4. Technical Maintenance 4.1 Mechanical and Electrical Checks 67 4.2 Function Test 70 4.3 Spare Parts - Overall View 72 4.4 List of Spare Parts 79 5. Troubleshooting 84 6. Replacing Boards 86 7. Version Updates 86 8. Maintenance Verification 87 9. Location of Identification Labels 88 06/00 -3 of 90 -0116 7201 Rev. 00 © 2000 Hans Pausch Rontgengeratebau Graf-Zeppelin-Str. 1 D-91056 Erlangen ALL RIGHTS RESERVED Ru 1. TECHNICAL DATA 1.1 General Safety Information Maintenance and repair may be performed only by an office that is authorized by the manufacturer. In the Federal Republic of Germany, electrical installation of medically used rooms must conform to VDE Regulation 0107. In all other countries, the particular applicable national regulations take precedence and must be observed. These can be found in the system project plan. During installation, it must be assured that all ground wire connections provided by the manufacturer must be connected prior to starting up the unit. The ground wire between the individual components and the power supply must be connected as shown in the Wiring Diagram. The regulations provided by the trade unions for occupational safety and prevention of accidents must be observed. No work may be performed on parts that are under power (above 42 V). This condition applies for both measurement and adjustment work steps. However, special care is required when performing these worksteps. If the operating instructions call for voltage to be switched on for unit movements, the system must be shut down immediately following such tests. The radiation regulations must be observed while making settings and checks that must be performed under X-radiation; radiation protective clothing must be worn. 1.2 Component Weights Unit column approx. 320 kg Table approx. 230 kg Tube unit support arm approx. 50 kg Footswitch approx. 5 kg Total...
Escreva a sua própria avaliação do dispositivo
|
|