13 12 14 DO NOT OVER TIGHTEN IMPORTANT! TWO PEOPLE REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE. WARNING! THE CUT CORNERS OF THE POLE BRACKET NEED TO FACE TOWARD THE BACK OF THE BASE AS SHOWN. IMPORTANT! 13 08/05 ID# M601114 3. Rotate non-secured ends of tank struts (16) outward to mounting holes in tank as shown.Secure ends of tank struts (16) to tank as shown. Repeat for opposite side. Secure tank struts (16) to pole as shown. Nut should be tightened until flush (even) with lock nuts outer edge. Place cap (17) over exposed end of bolt as shown. 9 10 11 10 10 10 14 17 13 16 16 16 4. TWO PEOPLE REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE. WARNING! IMPORTANT! ID# M601114 8/05 14 5. 6. Insert axle (5) through wheel bracket (4). Secure wheels (6) to axle using pushnuts (7). Carefully tap pushnuts onto axle with hammer or mallet 4 6 6 7 7 5 Install wheel assembly to base (8) using bolts(9), washers(10) and nuts (11) as shown. 10 9 11 10 8 SIDE OF WHEEL WITH LONGER PLASTIC AXLE NEEDS TO FACE THE WHEEL BRACKET. IMPORTANT! 15 08/05 ID# M601114 TOOLS REQUIRED FOR THIS SECTION SECTION C: ASSEMBLE THE ELEVATOR & BACKBOARD This is what your system will look like when you’ve finished this section: 3/8” 1/2” 9/16” 3/4” (1) 3/8”, (2) 1/2”, (2) 9/16” and (2) 3/4” (2) AND/OR ID# M601114 8/05 16 1. Install pole mount bracket (28) and reinforcement bracket (18) with carriage bolts (22) as shown. Tighten flange nuts (11) completely. 1 28 11 11 18 22 22 2. Attach spacers (24, 43) to pole mount bracket (28) with bolts (29), washers (50), and lock nuts (31) as shown. 28 50 50 31 29 50 50 43 24 24 43 IMPORTANT! Tighten just until washers (50) stop moving. 17 08/05 ID# M601114 3. 28 11 27 35 35 26 19 FIG. A Apply logo and height indicator labels (23) to adjustment rod (58) as shown. Attach handle parts (59, 60) to adjustment rod with screw (55), carriage bolts (54), and flange nuts (11) as shown. 4. 54 11 11 60 59 55 54 58 23 23 Assemble lanyard (26) to locking pin (27) as shown (FIG A). Attach covers (35) onto pole mount bracket (28) with carriage bolt (19) and nut (11) as shown. IMPORTANT! Loop end of pin lanyard (26) over carriage bolt (19) as it passes through the pole mount bracket (28) during this assembly. IMPORTANT! Indicator labels should be applied as close to holes as possible to prevent labels from being damaged during height adjustment. ID# M601114 8/05 18 29 30 30 29 52 Insert handle assembly through pole mount assembly as shown. Lock pole assembly in place at the 10’ (3.05 m) mark with pin (27). 27 5. 6. Assemble backboard brackets (52) 52 using bolts (29), and nuts (30) as shown. 52 NOTE ORIENTATION 8. 8. Identify elevator tubes (33 & 34). 33Upper Elevator tube Toward Pole Toward Board 34Lower Elevator tube Toward Pole Toward Board Attach lower elevator tubes (34) and counter balance spring (36) to backboard support brackets (52) using spacers (53 & 56), bolt (57), and nut (21) as shown. 57 36 56 52 21 34 34 53 56 36 68 52 66 52 19 08/05 ID# M601114 9. 9. Attach upper elevator tubes (33) to backboard support brackets (52) using spacers (53), bolt (57), and nut (21) as shown. Tighten ALL Hardware from Steps 6-8 After this Assembly is Completed. IMPORTANT! 33 56 52 2153 57 33 56 57 56 56 2153 33 33 ID# M601114 8/05 20 21 21 49 25 34 1 32 32 57 20 34 20 10. Support pole on sawhorse. Attach backboard assembly to top pole section (4) as shown. Install pole cap (25). 57 34 33 20 21 1 21 33 20 32 58 11. Install upper elevator tubes (33) to triangle plates (63) as shown. Install handle assembly to lower elevator tubes (34) using bolt (57), spacers (20), and nut (21) as shown. 57 34 34 20 20 Before going on to next step, set adjustable system assembly to the 10’ (3.05 m) setting. NOTE: 21 08/05 ID# M601114 ID# M601114 8/05 22 12. Install Rim to Backboard A. Fit rim (67) securely into bracket (61) as shown. Allow T-bolt (66) to slip through center hole in rim (67). B. Install reinforcement bracket (62) onto T-bolt (66) as shown. C. Install spring (64) onto T-bolt (66) as shown. D. Install special nut (65) and washer (63) onto T-bolt (66). E. Tighten special nut (65) until flush with end of T-bolt (66). 62 65 63 61 67 66 64 66 63 65 66 66 NOTE: ORIENTATION OF BRACKET 62 A. B. C. D. E. 23 08/05 ID# M601114 33 36 21 33 58 14. Insert bolt (57) through left side upper elevator tube (33), then stretch spring (36) onto bolt (57). Insert bolt (57) through right side upper elevator tube (33) and secure with nut (21). 57 Peel protective 36 film from surface of acrylic backboard prior to use. NOTE: USE EYE PROTECTION WHEN INSTALLING SPRINGS. WARNING! 13. Install net (43). A. B. C. D. ID# M601114 8/05 24 15. Roll assembly to desired playing area. Fill base (8) with water (approx. 40 gallons) and snap base plugs (37) in place. 37 37 8 FILL BASE WARNING! CAUTION NOTE SAND 450 LBS. (204 KG) Sable Sand A...