Log:
Assessments - 3, GPA: 4 ( )

Instruções de Operação ParaBody, Modelo 425104

Fabricante : ParaBody
Arquivo Tamanho: 2.84 mb
Arquivo Nome : a2e8e8f4-bd78-4a0b-95db-cc411c7592ef.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


• Route the LAT CABLE (99) as shown in FIGURE 33. (Remove pulleys for ease of installation.) • Run the LAT CABLE (99) through one of the holes in the D-RING (7) and attach one KEYHOLE CLEVIS (66) to the end of the LAT CABLE (99). See FIGURE 36 . • Replace and SECURELY tighen the FRONT UPRIGHT (25) and TOP BOOM (17) connection and any pulleys from the previous step. (NOTE: Make sure the LAT CABLE runs over the top of the bolts in the top boom.) NOTE: REMOVE BOLTS FOR CABLE INSTALLATION 25 17 99 7 WEIGHT STACK CABLE 66 99 102 34 STEP 38 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 • To assemble the PRESS CABLE (100) follow the cable routing as shown and use the following steps: • Route the PRESS CABLE (100) around pulleys and L-brackets as shown in FIGURE 38. FIGURE 37 FIGURE 38 STEP 37 • Assemble two 4-1/2” PULLEYS (43) to two 2 X 7-1/4” PLATES (33) using two 3/8 X 2-1/4” BOLTS (86) four 3/8” WASHERS (91), and two 3/8” LOCK NUTS (92) as shown in FIGURE 37. 91 86 3/8 X 2-1/4” 43 33 92 100 100 35 FIGURE 39 STEP 39 • Run the PRESS CABLE (100) through the hole in the D-RING (7) as shown in FIGURE 37 and attach one KEYHOLE CLEVIS (66) to the end of the PRESS CABLE (100). See FIGURE 39. 66 100 LAT CABLE 7 WEIGHT STACK CABLE PRESS CABLE 100 36 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 FIGURE 41 STEP 40 • Assemble one 3-1/2” PULLEY (42) around the PEC DEC CABLE (98) and to the PULLEY BRACKET (29) using one 3/8 X 2” BOLT (84), two 3/8” WASHERS (91) and one 3/8” LOCKNUT (92) as shown in FIGURE 40. FIGURE 40 STEP 41 • Slide the ends of the PEC DEC CABLE (98) into the bushings on the PEC CAMS (24) as shown on FIGURE 41. • Lay the PEC DEC CABLE (98) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (26) as shown in FIGURE 41. (NOTE: Securely tighten the pulley connections in the CENTER PULLEY BRACKET (26). The cable retaining clips should be at approximately a 45° angle.) 42 92 29 98 84 3/8 X 2” 91 98 98 24 PEC CABLE 26 37 DETAIL 42 FIGURE 42 SEE DETAIL 39 STEP 42 • Securely assemble the ball end of the AB CABLE (103) and one 3-1/2” PULLEY (42) to the FRONT UPRIGHT (25) using two 3/8 X 2- 3/4” BOLTS (85), two 3/8” FLANGE SPACERS (49), two 3/8” WASHERS (91), and two 3/8” LOCKNUTS (92). (NOTE: The AB CABLE (103) should be routed underneath the retaining bolt as shown in DETAIL 42.) 25 3/8 X 2-3/4” 85 91 92 42 49 103 • Run the AB CABLE (103) through the floating pulley assembly, then screw the threaded end of AB CABLE (103) approximately 3/4” into the end of the PULLEY BRACKET (29) and tighten jam nut securely as shown in FIGURE 43. STEP 43 IMPORTANT! Make sure the cables are running in the grooves of all pulleys. FIGURE 43 AB CABLE 29 103 FLOATING PULLEY 38 STEP 44 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 • To assemble the LEG CABLE (101) follow the cable routing as shown and use the following steps: • SECURELY attach the LEG CABLE (101) to the LEG CURL/EXT (15) using one 3/8 X 1-1/4” BOLT (83), one 3/8” WASHER (91), and one 3/8” LOCK NUT (92). See FIGURE 44. FIGURE 45 FIGURE 44 • Route the LEG CABLE (101) around the pulleys in the BASE (1) and through the floating pulley as shown in FIGURE 44. STEP 45 • Run the LEG CABLE (101) through the hole of the D-RING (7) and attach one KEYHOLE CLEVIS (66) to the end of the LEG CABLE (101). See FIGURE 45. 66 1 15 91 101 92 83 3/8 X 1-1/4” 101 101 FLOATING PULLEY LAT CABLE PRESS CABLE 7 101 FIGURE 46 STEP 46 • Attach three ELASTIC CORDS (67) to the three KEYHOLE CLEVIS (66) as shown in FIGURE 46. 39 FIGURE 47 STEP 47 TOP BOOM • Assemble the 72” ELASTIC CORD (67) from the PRESS CABLE around the 2” PULLEY (69) in the TOP BOOM as shown in FIGURE 47. 67 LEG EXT CABLE LAT CABLE PRESS CABLE 69 67 40 FIGURE 48 STEP 48 TOP BOOM • Assemble the 72” ELASTIC CORD (67) from the LEG CABLE around the 2” PULLEY (69) in the TOP BOOM as shown in FIGURE 48. 67 69 LEG EXT CABLE LAT CABLE PRESS CABLE FIGURE 49 STEP 49 TOP BOOM • Assemble the 72” ELASTIC CORD (67) from the LEG CABLE around the 2” PULLEY (69) in the TOP BOOM as shown in FIGURE 49. 67 69 LEG EXT CABLE LAT CABLE PRESS CABLE 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 41 FIGURE 50 STEP 50 • Assemble the ELASTIC CORD (67) from the PRESS CABLE to the SWIVEL SNAP (68) on the BASE as shown in FIGURE 50. 68 BASE 42 67 PRESS CABLE ELASTIC CORD FIGURE 51 STEP 51 43 • Assemble the ELASTIC CORDS (67) from the LAT & LEG CABLES to the corresponding SWIVEL SNAPS (68) on the BASE as shown in FIGURE 51. 68 BASE LAT CABLE 67 ELASTIC CORD LEG CABLE 67 ELASTIC CORD 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 • If upon completion of assembly, the HEAD PLATE (72) does not sit on top of the first WEIGHT PLATE (105), push the HEAD PLATE (72) down, insert the WEIGHT STACK PIN (75) and perform several repetitions at the press station. This will relax the cable system and prevent the HEAD PLATE (72) from lifting up. STEP 52 • If after completing previous step, the HEAD PLATE (72) still does not sit on top of the first WEIGHT PLATE (105) or if there is excess s...


Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias