|
Facilidade de uso
When installing, an omnipolar disconnector with a distance of at least 3 mm between contacts must be provided. Electrical connection 220-240 V – by means of fixed power cable with plug. (Fixed connection of the appliance must only be carried out by an authorised electrician.) Electrical connection for UK only Safety warnings for the electrician The electric outlet should be placed on the wall inside the chimney. The hood has a power cable, 150 cm, with earth connection and the rated voltage is 220 - 240 V. Connect the hood to the mains supply via a double pole switch which has 3 mm minimum separation between the contacts. The switch must be accessible at all times. The following is valid in the United Kingdom only: -the wire which is coloured green and yellow must be connected to the terminal which is marked with the letter E or by the earth symbol ( ), or coloured green or green and yellow; -the wire which is coloured blue must be connected to the terminal which is marked with the letter N or coloured black, - the wire which is coloured brown must be connected to the terminal which is marked with the letter L or coloured red. Installation - Fig. 6-7-8 Expansion plugs are provided to secure the hood to most types of ceilings. However, a qualified technician must verify suitability of the materials in accordance with the type of ceiling. The ceiling must be strong enough to take the weight of the hood. During electrical connection ensure the power supply is disconnected at the domestic mains switch. • Adjust extension of the hood support structure, as the final height of the hood depends on this, and remember that with installation completed the hood must be at least 60 cm above the hob top for electric cookers and 75 cm for gas or mixed fuel cookers. • Fix the two sections of the structure using 8 screws (2). • Place the ceiling hole diagram directly above the hob top (3 - the centre of the diagram must match the centre of the hob top and the edges must be parallel to the sides of the hob top – the side of the diagram with the wording FRONT corresponds to the control panel side). Prepare the electrical connection. • Drill as shown (6 holes for 6 wall plugs – 4 plugs for fixture), screw the outer screws leaving a space of about 1 cm. between the screw head and the ceiling (4). • Fit an exhaust pipe inside the support (5) and connect it to the motor compartment connection ring (exhaust pipe and fixing brackets are not supplied). • Hook the frame onto the 4 screws (6 - see also step 4). CAUTION! The side of the support with connection box corresponds to the side of the control panel with hood assembled. • Tighten the 4 screws (7). • Insert and tighten another 2 screws in the remaining free holes (8) for secure fixing. • Carry out the electrical connection (9) to the mains power supply, only turn on the power supply upon completion of assembly. • Hook the hood onto the support (10) , ensuring it fits properly – to hook the hood onto the support partially tighten 4 screws (see also step 12). • Secure the hood to the support using two screws (11); this will also help centre the two sections. • Tighten the 4 screws securing the support to the hood (12). 69 Fig. 6 • For extractor versions (13A), connect the other end of the exhaust pipe to the flue. For filter versions (13F), fit deflector F to the support and secure it to the bracket supplied using 4 screws, then connect the exhaust pipe to the connection ring located on the deflector. • Fit the nuts with fixing hooks (14) supplied inside the top and bottom sections of the flues at the rectangular slots. A total of 10 nuts must be fitted. • Join the two top sections of the flue to cover the support (15) so that one of the slots on the sections is situated on the same side of the control panel and the other on the opposite side. Screw the two sections together with 4 screws (2 each side- see the plan diagram for joining the two sections). • Fix the top flue assembly to the support, near the ceiling, with two screws (16 - one each side). • Carry out electrical connection of control panel and bulbs (17). • Join the two bottom sections of the flue covering the support (18) using 6 screws (3 each side, see the plan diagram for joining the two sections). • Insert the bottom section of the flue in its seat so that it completely covers the motor compartment and electrical connection box, then ensure it from inside the hood using two screws (19). • Apply the 2 tabs (20 - supplied) to cover the fixing points of the bottom flue (CAUTION! THE BOTTOM FLUE TABS ARE THE NARROWER AND SHALLOWER ONES). The wider and deeper tabs are those used for the top flue, and must be cut to size. • Turn the mains power on again at the central electrical panel and check for correct hood operation. 71 Fig. 7 72 Fig. 8 AEG Hausgerate GmbH Postfach 1036 D-90327 Nurnberg © Copyrig...
Este manual também é adequado para os modelos :Fans - CHDI 8610 (458.6 kb)