Log:
Assessments - 4, GPA: 3.8 ( )

Instruções de Operação Creda, Modelo TSF32K

Fabricante : Creda
Arquivo Tamanho: 871.42 kb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


No loops of cable should be left behind or underneath the unit. Core space cover 5. Stability The heater must be fixed securely to a solid wall to prevent movement. A screw with wall plug is provided in the accessory pack to secure the heater. The assembled heater must be able to resist a horizontal pull of at least 200N on its upper edge without toppling or shifting. If the required stability cannot be achieved with the supplied accessories, e.g. in the case of light-construction walls, the installer must select a suitable wall fixing method. 6, Remove core space cover. For this purpose, unscrew the middle fastening screw, swing the core space cover out slightly on the right-hand side and pull it to the right. Lay the cover down in such a way as not to damage the thermal insulation. 2 7, Remove the transport protection (folded cardboard). 8. Put in the lower row of storage bricks. Begin at the right-hand side. Element slots must always face upwards. 9. After putting in the lower row of bricks, install the first heating 10. Put in the second and third rows of bricks. Install second ele- element. ment. 11. After putting in the fourth row of bricks, the third element must 12. Put in the last row of bricks (6 rows of bricks in all). Clean the be installed. Then slide the fifth row of bricks sideways under the air outlet space and the switching space, third element. 3 13. Refit core space cover. Left-hand side: The lip at the top of the core space cover must lie on the left-hand partition. The side edge of the core space cover must be pushed behind the lip of the left-hand partition. Right-hand side: Insert side flange of the core space cover between the thermal insulation and the partition, paying attention to the guide slots. Tightly press the core space cover and screw it tightly to the right-hand partition. 14. Connect the element tails to the cable harness. For this purpose, place the numbered connecting cables on the terminal ends of the elements. The partition is also marked with the corresponding numbers. Fasten loose cables to the cabie harness to oavold contact to the hot ends of the heating elements. Electrical connection 15. NOTE: Two supplies are taken into the heater, an off-peak supply to the heating element circuit and a separate on-peak supply to the fan circuit (see wiring diagram). Refer to rating label on front of heater case for the loading of heater and fan circuits on the appliance supplied. Introduce mains supply cables through the cable clamps in the back panel, to the terminal area, and connect In accordance with the terminal markings and wiring diagrams. Heat resisting cable must be used. Ensure that cable Is clamped so that there is no excess cable In the terminal area. CHECK ALL ELEMENT AND SUPPLY CONNECTIONS FOR TIGHTNESS. On no account should any surplus cable be pushed inside or behind the heater. The appliance must be earthed. Special instructions: 3 phase supply The heater is factory supplied for connection to a single phase 240 volt supply. The heater may alternatively be connected to a 3 phase, 415 volt supply by removal of bus-bars, as shown on the wiring diagram. 4 Completion of heater assembly 16. Insert the front panel into the folded edge on the cover, raising 17, Screw the front panel tightly (screw B). DO NOT OVERTIGH- the cover slightly In doing so. TEN THE SCREWS. 18. Before fitting the right-hand side panel knock out the plastic 19. The si...

Este manual também é adequado para os modelos :
Fans - TSF24K (871.42 kb)
Fans - TSF42K (871.42 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias