Fabricante : Dacor
Arquivo Tamanho: 1.5 mb
Arquivo Nome : 99043841.pdf
|
Facilidade de uso
Distances over 30” are at the installers discretion; and if ceiling height and flue length permit. Note b - a 10-foot high ceiling requires use of an optional flue extension FXWC50EC, available from your local dealer. - 6 INSTALL FLUE MOUNTING BRACKET (DUCTED AND NON-DUCTED HOODS) 1. Assemble the flue mounting bracket, adjusting outside width as shown. See Figure 7. 2. Carefully center the mounting bracket directly over the range hood location. 3. Secure the bracket assembly to the ceiling using (2) 4.8x38mm mounting screws and drywall anchors (Fig. 8). Make sure the bracket is pushed into the corner, tight against the wall and centered over the hood. FLUE MOUNTING BRACKET 9-13/16” (248.6 mm) FIG. 7 3.9 x 6 mm FLAT HEAD BRACKET SCREWS FIG. 8 4.8x38mm MOUNTING SCREWS DRYWALL ANCHORS PREPARE THE HOOD Note: On stainless steel hoods, carefully remove the plastic protective film from all exterior surfaces of the hood and decorative flues, prior to final installation. (DUCTED HOODS ONLY) Install the discharge collar into the duct connector of the range hood. Fig. 9. DISCHARGE COLLAR DUCT CONNECTOR FIG. 9 - 7 PREPARE THE HOOD (NON - DUCTED HOODS ONLY) Note: The following materials must be purchased separately for non-ducted recirculation installations. • Non - Ducted Recirculation Kit, Model DFKTWC50EC. • 5” diameter metal duct. 1. Discard discharge collar supplied with the hood. Install the 5” to 6” adapter supplied with the Non-Ducted Recirculation Kit. Fig. 10. 2. Secure the plenum to the flue mounting bracket with (2) 3.9x6mm flat head screws (the screws are supplied with the Non-Ducted Recirculation Kit). Fig.11. FIG.10 FIG.11 5”-6” ADAPTER 3.9x6mm FLAT HEAD SCREWS PLENUM FLUE MOUNTING BRACKET INSTALL THE HOOD Note: at least two people will be required to mount the hood. 1. Raise the hood into its mounting position. 2. Align the rectangular opening on the back of the hood with the wall-mounting bracket. Gently lower the hood until it securely engages the bracket. Fig. 12. 3. Level the hood with (2) mounting screws (3.9x9.5mm) and secure with (4) mounting screws. Use drywall anchors provided if wall studs or framing are not available. Fig. 12. 4. On ducted hoods, attach 6” round metal duct between the hood’s blower collar and duct that leads to the outside location. 5. On non-ducted hoods, attach 5” round metal duct between the 5”-6” adapter on the hood and the connector on the plenum. 6. Tape all duct joints to make them secure and air tight. FIG.12 MOUNTING SCREWS (4.8x38mm) RECTANGULAR CUTOUT WALL FRAMING MOUNTING BRACKET MOUNTING SCREWS (4.8x38mm)MOUNTING SCREWS (3.9x9.5mm) DRYWALL ANCHORS - 8 MAKE ELECTRICAL CONNECTIONS WARNING: Electrical wiring must be done by a qualified person(s) in accordance with all applicable codes and standards. This range hood must be properly grounded. Turn off electrical power at service entrance before wiring. 1. Remove the wiring box cover. Remove a knockout from the wiring box. 2. Secure the conduit to the wiring box through a conduit connector. 3. Make electrical connections. Connect white to white, black to black and green to green. 4. Replace wiring box cover and screws. Make sure that wires are not pinched between cover and box. INSTALL DECORATIVE FLUES FIG.13 WIRING BOX COVER 1. Carefully place the decorative flue on the hood. Fig. 14. -On ducted installation in rooms with 8-foot ceilings, the air vents are concealed. Install the flue with the air vents down. -On non-ducted installations in rooms with 8-foot ceilings, the air vents are exposed. Install the flue with the air vents up. -On ducted and non-ducted i...
Este manual também é adequado para os modelos :Fans - PL36WC50EC (1.5 mb)
Fans - PL36WC50EC (1.5 mb)
Fans - PL36WC50EC (1.5 mb)
Fans - PL36WC50EC (1.5 mb)