|
Facilidade de uso
Return the bin to an upright position. Check the bin top gasket for gaps and tears, fill any in with food grade sealant prior to placing the ice machine on the bin. Install the bin top adapter if one is required for the application. If the ice machine has not been unpacked, do so now. Remove the carton from the skid. Lift the ice machine off the skid directly onto the bin. Note: The machine is heavy! Use a mechanical hoist if necessary. Secure the ice machine to the bin with the hardware provided (two metal straps and 4 bolts). Level the bin and ice machine using the adjustment part of the legs. Bin Recycling Many times an ice machine head will be replaced, while the existing ice storage bin will be reused. This is an acceptable practice, if some precautions are taken: • The used bin must be in good condition. Broken doors, hinges, or warped walls are reason for considering a new bin. • The used bin top edge gasket must be replaced. Water leaks could occur if the gasket tape is not replaced. • The used bin should be the proper size for the ice machine head. November 2006 Page 9 C1448, C1848, C2148W Air and Water Cooled User Manual Plumbing Requirements All models require connection to cold, potable water. A hand actuated valve within site of the machine is required. Air cooled models have a single 3/8” FPT inlet water connection, a 3/8” FPT to 3/8” male flare adapter is supplied with the machine and can be used if desired. Water Fitting Inlet Water Connection Water cooled models have a 1/2" FPT drain fitting plus an additional 3/8” FPT condenser inlet water connection. Water Filters If connecting to water filtration, filter only the water to the reservoir, not to the condenser. Install new cartridges if the filters were used with a prior machine. A triple head filter is recommended. Either the Scotsman SSM3 taste and odor filter system, or the ADS-AP3 Aqua Patrol system. November 2006 Page 10 Drains All models require drain tubing to be attached to them. Air cooled models have a single .” FPT drain fitting in the back of the cabinet. Water cooled models have the same fitting plus an additional .” FPT drain fitting in the back of the cabinet. Install new tubing when replacing a prior ice machine, as the tubing will have been sized for the old model and might not be correct for this one. 1 Connect water supply to water inlet fittings. Note: This NSF listed model has a 1" anti-back flow air gap between the end of the water inlet tube and the highest possible reservoir water level, no back flow device is required for the potable water inlet. 2 Connect drain tubing to drain fittings. 3 Route the drain tubing to building drain. Follow local codes for air gap. Use rigid drain tubes and then route them separately – do not Tee into the bin’s drain or, if water cooled, Tee the condenser drain into the reservoir or bin drain. Vent the reservoir drain. A vertical vent at the back of the drain, extended about 8 – 10” will allow the gravity drain to empty and also keep any surges during draining from discharging water. Horizontal runs of drain tubing need a .” per fall per foot of run for proper draining. Follow all applicable codes. November 2006 Page 11 C1448, C1848, C2148W Air and Water Cooled User Manual Water Supply and Drain Connections Optional Water Filters Water Cooled Condenser Inlet Water Cooled Condenser Drain Water Inlet Connection Potable Water Supply Reservoir Drain Floor Drain C1448, C1848, C2148W Air and Water Cooled User Manual Electrical The machine is not supplied with a power cord, one must either be field installed or the machine hard-wired. The dataplate on the back of the cabinet details the power requirements, including voltage, phase, minimum circuit ampacity and maximum fuse size. HACR type circuit breakers may be used in place of fuses. Extension cords are not permitted. Use of a licensed electrician is recommended. Electrical connections are made inside the junction box in the back panel of the ice machine. 1 Remove the junction box cover and route the power cord through the access hole and Power properly attach the power supply wires to the Supply Wires leads in the junction box. 2 Install a field supplied strain relief per code. Attach a ground wire to the ground connection in the junction box. 3 Check voltage when complete. 4 Return the junction box cover to its original position and secure with the original screws. Follow all applicable local, state and national codes. Ground Wire Connection Install Strain Relief November 2006 Page 12 C1448, C1848, C2148W Air and Water Cooled User Manual Final Check List After connections, 1 Wash out the bin. If desired, the interior of the bin could be sanitized. 2 Locate the ice scoop (if supplied) and have it available for use when needed. Final Check List: 1 Is the unit located indoors in a controlled environment? 2 Is the unit located where it can receive adequate cooling air? 3 Has the correct electrical power been supplied to the machine? 4 Have al...
Este manual também é adequado para os modelos :Air - Air and Water Cooled C1448 (2.58 mb)
Air - Air and Water Cooled C2148W (2.58 mb)