Log:
Assessments - 2, GPA: 3.5 ( )

Instruções de Operação Sears, Modelo N9MP1050B12B1

Fabricante : Sears
Arquivo Tamanho: 3.24 mb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Disconnect the 5/8" OD rubber hose from the vent drain fitting that is located downstream of the combustion blower. Insert a funnel into the hose and pour four(4) ounces of sanitary type (RV) antifreeze into the condensate trap. Reconnect the 5/8" OD rubber hose to the stub on the vent drain fitting. Secure with the hose clamp. 2. Disconnect the 3/4" OD rubber hose from the condensate trap. Insert a funnel into the hose and and pour four(4) ounces of sanitary type (RV) antifreeze into the plastic Transition box. Squeeze the hose together near the end and quickly reconnect the 3/4" OD rubber hose to the stub on the condensate trap. Secure with the hose clamp. When you return home, your furnace will be ready to start, as it is not necessary to drain the antifreeze from the furnace. If furnace is a replacement, it is usually best to install the furnace where the old one was. Choose the location or evalu ate the existing location based upon the minimum clearance and furnace dimensions (Figure 3). FROZEN AND BURST WATER PIPE HAZARD Failure to protect against the risk of freezing could result in property damage and/or personal injury. Special precautions MUST be made if installing furnace in an area which may drop below freezing. This can cause improper operation or damage to equipment. If furnace environment has the potential of freezing, the drain trap and drainline must be protected. The use of electric heat tape or RV antifreeze is recommended for these installations. (See "Condensate Trap Freeze Protection Section") Do NOT operate furnace in a corrosive atmosphere containing chlorine, fluorine or any other damaging chemicals. Refer to Combustion & Ventilation Air section, Contaminated Combustion Air. E_ 440 01 1020 04 Installation Requirements Typical Upflow Installation 1. Install furnace level. Aluminumor non-rustingshield recommended.(See Vent TerminationShieldingfor dimensions). 2. This furnace is NOT to be used for temporary heat of buildings or structures under construction. Coupling on ends of *8" Min. _l[q _I_ exhaust pipe. Total 3. Install the vent pipes as short as practical. (See Gas Vent 20' Max. Inlet Pipe (not in same _ _ used on Single pipe & coupling out-Installation section). atmospheric <_ __4t_ Pipe model) side structure = 8" 4. Do NOT install furnace directly on carpeting, tile or other combustible material other than wood flooring. zone 5. Maintain clearance for fire safety and servicing. A front clearance of 30" is minimum for access to the burner, controls and VentPipes MUSTbe filter. See clearance requirements in Figure 3 or. /]in. supported 6. Use a raised base if the floor is damp or wet at times. and Vertically me atmospheric 7. Residential garage installations require: • Burners and ignition sources installed at least 18" (457 ram) above the floor. Furnace must be located or physically protected from pos sible damage by a vehicle. * Increase minimum from 8" to 18" for cold climates (sustained temperatures below 8. If the furnace is to be suspended from the floorjoists in a base0 ° F). 25-23-33 ment or a crawl space or the rafters in an attic, it is necessary to use steel pipe straps or an angle iron frame to attach the furnace. These straps should be attached to the furnace with Typical Downflow Installation sheet metal screws and to the rafters or joists with bolts. The preferred method is to use an angle iron frame bolted to the See VentTermination rafters or joists. Coupling on inside Shieldingin VentSection. and outside of wall to restrain vent pipe I his furnace may be used for construction heat provided that all the following conditions are met: _1 14' *8" Min. InletPipe _ [_ 20' Max. The furnace is permanently installed with all electrical wir (not used on_ _ insame SinglePipe _ I,,,_ L, atmospheric zone ing, piping, venting and ducting installed according to these model) _ installation instructions. A return air duct is provided, sealed to the furnace casing, and terminated outside the space containing the furnace. This prevents a negative pressure Vent Pip MUST bq condition as created by the circulating air blower, causing a support( 4orizonta flame rollout and/or drawing combustion products into the and Vertically Min. structure. Max. same • The furnace is controlled by a thermostat. It may not be "hot osphericzone wired" to provide heat continuously to the structure without thermostatic control. Clean outside air is provided for combustion. This is to mini mize the corrosive effects of adhesives, sealers and other construction materials. It also prevents the entrainment of drywall dust into combustion air, which can cause fouling and plugging of furnace components. * Increase minimum from 8" to 18" for cold climates (sustained temperatures The temperature of the return air to the furnace is no less below O°F). 25-23-33a than 55 ° F, with no evening setback or shutdown. The use of the furnace while the structure is under construction is deemed to be intermittent operatio...

Este manual também é adequado para os modelos :
Eléctrico - 9MPD125L20B1 (3.24 mb)
Eléctrico - 9MPD100J20B1 (3.24 mb)
Eléctrico - 9MPD100J14B1 (3.24 mb)
Eléctrico - 9MPD080J16B1 (3.24 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias