Log:
Assessments - 2, GPA: 3.5 ( )

Instruções de Operação Napoleon Fireplaces, Modelo EPA1100L

Fabricante : Napoleon Fireplaces
Arquivo Tamanho: 1.02 mb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


1-1/4" x 4"-1/2 x 9" #2. 1-1/4" x 3" x 9" #3. 1-1/4" x 4-1/2" x 4-1/2" #4. 1-1/4" x 4-1/2" x 9" #5. 1-1/4" x 2-1/2" x 4-1/2" #6. 1-1/4" x 1-1/2" x 4-1/2" #7. 1-1/4" x 4-1/2" x 9" * (light weight) #8. 1-1/4" x 2-1/4" x 9" #9. 1-1/4" x 2-1/4" x 6-1/8" #10. Fibre baffle - 9” x 1” x 12” #11. Fibre baffle - 9” x 1” x 16 1/2” #12. Fibre baffle - 9” x 1” x 9 3/4” #13. Fibre baffle - 9” x 1” x 9 3/4” BACK SIDES TOP FLOOR FRONT FINISHING 10 10 MODEL 1100/1100C/1100L/1150 - FIGURE 21 11 11 MODEL 1400 / 1400L - FIGURE 23 MODEL 1401- FIGURE 24 MODEL 1101 - FIGURE 22 10 10 MODEL 1900 - FIGURE 25 BRICK RETAINER DETAIL - TYPICAL AREA CIRCLED ON EACH FIGURE INDICATES THE BRICK RETAINER DETAIL BRICKS AND BAFFLES INSTALLATION OPTIONAL ASH DRAWER KIT BRICKS AND BAFFLES INSTALLATION OPTIONAL ASH DRAWER KIT 1. Install two or three courses of brick on both sides of the unit. Install two courses on the back wall. Install the final course of bricks on the back wall. These bricks are held in place by a brick retainer. Before installing the bricks, loosen the screw holding the retainer and ensure that it has been moved forward. Insert the final two bricks behind the retainer and while still holding the bricks in place, slide the retainer snugly into place. Retighten the screw. 2. 1900 only: Place the stainless steel support onto the top row of the bricks as illustrated on page 10. Pivot the 2 piece baffle up and onto the support, then slide them over and onto the flange of the manifold. Ensure that the overlaps are interlocked to close the gap. Push the baffles to the rear of the firebox. Repeat for the opposite side. 3. Carefully pivot fibre baffle up onto the top of the side brick. Slide it over onto the flange of the manifold. Ensure that the top baffles are pushed all the way to the rear of the firebox, leaving a minimum of a 1 inch gap along the front. This will allow the flue gases to escape the firebox. 4. Install the bottom bricks, working from the back of the unit. 5. Install the 2 bricks along the front. NOTE: DO NOTE OPERATE IF BAFFLE AND MANIFOLD SHEILD ARE NOT IN POSITION ORNAMENTAL TRIVET INSTALLATION Insert the ornamental trivet into the space on the stove top. TRIVET FIGURE 26 DOOR AND HANDLE INSTALLATION Hang the door using the hinge pins supplied. Twist the large wire handle over the end of the handle rod. Twist the smaller wire handle over the end of the air damper rod below the door. Install ash pan pull handle using screws and washers. See FIGURE 26. FIGURE 27 PEDESTAL TRIM INSTALLATION Ensure that the pedestal surfaces are clean and dry; peel the protective backing from the trim adhesive. Insert one end of the brass trim into one of the slots located in the pedestal and pressing firmly, proceed around to the other slot. Cut trim to size. Attach the rear knockout plate (located inside the ash pan for shipping purposes). FIGURE 28 Models 1100L / 1400L Only: Provisions have been made on the stove to install an optional ash drawer kit. The EPADKT kit allows for convenient removal of excess ash. This kit can be purchased through your Napoleon Dealer. FIGURE 29 OPERATION CAUTION: Never use gasoline, gasoline-type lantern fuel, kerosene, charcoal lighter fluid, or similar liquids to start or ‘freshen up’ a fire in this heater. Keep all such liquids well away from the heater while it is in use. Objects placed in front of the fireplace should be kept a minimum of 5” from the front face. Your Napoleon EPA listed product is a Hi-Tech unit, designed with the most advanced technology. The unit is extremely airtight. It has an exclusive direct outside air supply (optional kit), a safety feature designed to prevent spillage, and to keep your house free of carbon monoxide, in case of a downdrafting chimney or an internal negative pressure. The first fire(s) in your unit will be difficult to get going and keep going with little amount of heat being generated. This is a result of the moisture being driven out of the fire brick. Allow 30 to 40 hours of hot fires ( temperatures in excess of 500°F - 600°F) before your unit will perform normally. During the break-in period (the first 2 or 3 fires) create only small, hot fires using kindling; this will allow the firebrick to cure. Do not be alarmed if small hairline cracks develop in the firebrick. This is a normal occurrence and does not pose a safety hazard. The paint may also smell a little for the first few fires as it cures and you may wish to open a door or window to alleviate the smell. To start, a brisk fire is required. Place loosely crumpled paper on the floor of the stove and cover with dry kindling. Open the draft control fully by pulling the lever forward. Light the paper and leave the door slightly ajar (one inch) until all kindling is burning. To maintain a brisk fire, a hot coal bed must be established and maintained. Slowly add larger wood (2x4 size pieces). Lay the pieces lengthwise from side to side in the hot coal bed with a shallow trench between, so that the pri...

Este manual também é adequado para os modelos :
Lareiras - EPA1100 (1.02 mb)
Lareiras - EPA1400L (1.02 mb)
Lareiras - EPA1900 (1.02 mb)
Lareiras - EPA1100C (1.02 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias