Log:
Assessments - 2, GPA: 5 ( )

Instruções de Operação GE, Modelo CHDE5000AW

Fabricante : GE
Arquivo Tamanho: 3.01 mb
Arquivo Nome :
Língua de Ensino: enesfr
Ir para baixar



Facilidade de uso


Finger tighten the nut only at this time. 3. Remove the green neutral ground wire from the green ground screw located above the terminal block. Typical Conductor Receptacle y Black 240V '-White Neutral Typical 4 ■ Conductor Cord V^v-Red 240V \ Green Ground 16 English 4. Thread a U.L. approved 30 Amp power cord. NEMA 14-30 type ST or SRDT through the strain relief. 5. Attach the green power cord ground wire to the cabinet with green ground screw. 6. Attach the green wire conductors from the dryer and white (neutral) power cord conductors to the brass-colored center terminal on the terminal block. Tighten the screw securely. 7. Attach the red and black power cord conductors to the outer brass-colored terminals on the terminal block. Warning: Do not make a sharp bend or crimp the wiring /conductor at connections. 8. Tighten the screws securing the cord restraint firmly against the power cord. 9. Tighten the strain relief nut securely so that the strain relief does not turn. 10. Reinstall the terminal block cover. GAS CONNECTIONS GAS Dryer (HDG5000AW and HDG5300AW) NOTE: DO NOT connect the dryer to L.P. gas service without converting the gas valve. An L.P. Conversion Kit must be installed by a qualified gas technician. 1. Remove the shipping cap from gas pipe at the rear of the dryer. 2. Connect a 1/2 inch (1.27 cm) I.D. semi-rigid or approved pipe from gas supply line to the 3/8 inch (0.96cm) pipe located on the back of the dryer. Use a 1/2 inch to 3/8 inch (1.27 cm to 0.96cm) reducer for a connection. Apply an approved thread sealer that is resistant to the corrosive action of liquified gases on all pipe connections. 3. Open the shutoff valve in the gas supply line. 4. Test all connections by brushing on a soapy water solution. NEVER TEST FOR GAS LEAKS WITH AN OPEN FLAME. 5. Connect the exhaust duct to the outside exhaust system. Use duct tape to seal all joints. 6. With the dryer in its final position, adjust one or more of the legs until the dryer is resting solid on all four legs. Place a level on top of the dryer. THE DRYER MUST BE LEVEL AND RESTING SOLID ON ALL FOUR LEGS. 7. Plug the power cord into a grounded outlet. NOTE: check to ensure power is OFF at circuit breaker/fuse box before plugging the power cord into the outlet. 8. Turn on the power at the circuit breaker/fuse box. Before operating the dryer, make sure the dryer area is clean and free from combustible materials, gasoline, and other flammable vapors. Also see that nothing (such as boxes, clothing, etc.) obstructs the flow of combustion and ventilation air through the louvered panel located on the rear of the dryer. 9. Run the dryer through a cycle check for proper operation. NOTE: On gas dryers, before the burner will light, it is necessary for the gas line to be bled of air. If the burner does not light within 45 seconds the first time the dryer is turned on, the safety switch will shut the burner off. If this happens, turn the dryer to "OFF” and ...

Este manual também é adequado para os modelos :
Secadores - CHDE5000AW (3.01 mb)
Secadores - CHDE5300AW (3.01 mb)
Secadores - HDE5000AW (3.01 mb)
Secadores - CHDE5000AW (3.01 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias