Log:
Assessments - 0, GPA: 0 ( )

Instruções de Operação HP, Modelo HP StoreVirtual 4130 600GB China SAS Storage

Fabricante : HP
Arquivo Tamanho: 638.13 kb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



por este dispositivo também tem outras instruções :

Facilidade de uso



Verifying the bond
Configure the 10 GbE and 10 GbE ALB
1.
Navigate to the storage system Network category
and verify on the TCP/IP tab window that the
bond (using eth2 and eth3)
bond was created successfully.
2.
Switch to the Communication tab and verify that
CAUTION:
Bonding both the ports on the 10
the LeftHand OS Interface is set to communicate
GbE network adapter and then using this bond
via the ALB bond interface that you just created.
for all LeftHand OS software communication
could pose a risk to your volume and snapshot
Changing the VIP if required
availability in the event of any network
connectivity and/or functionality issues with the
1.
Select the cluster node and select the ISCSI tab.
10 GbE adapter. If you set up this bond
2.
Select the existing VIP address, click ISCSI Tasks
configuration, make sure you configure your
and select Edit VIP & Subnet mask.
volumes and snapshots for Network RAID-10 or
3.
Change the VIP to a valid VIP for the new
higher replication to ensure that your volumes
bond/network environment.
and snapshots remain available at all times.
4.
Add the bond IP address to the Find Systems list
and rediscover this storage system.
Creating the ALB bond
NOTE:
Delete the existing IP address that
1.
Log in to the management group, if necessary.
was being used to discover this storage
2.
Navigate to the storage system Network category
system.
TCP/IP tab window.
3.
5.
The Storage Server service on this storage system
4.
Select the 10 GbE ports labeled eth2 and eth3.
will restart to allow the networking changes to
5.
Right–click and select New Bond.
take effect. Wait for the Storage Server service
to become Normal before proceeding.
6.
Navigate to the storage system’s Network
category.
7.
Select the Communication tab to verify that the
Manager IP Addresses are correctly updated. If
not, click Communication Tasks and select Update
Manager IP Addresses.
8.
At this point, the SAN is ready to communicate
via the bonded 10 GbE interface.
Preparing the host server to be 10 GbE capable
While reconnecting to the iSCSI volumes, configure
the iSCSI initiator on the host server to communicate
via the 10 GbE interface for all iSCSI communication.
You have successfully upgraded your existing SAN to
10 GbE.
6.
Under Type, select Adaptive Load Balancing (ALB).
7.
Enter the IP Address, Subnet Mask, and Default
Gateway, and click OK. A confirmation prompt
Regulatory information
opens.
8.
Click OK to confirm the TCP/IP settings change.
For important safety, environmental, and regulatory
information, see Safety and Compliance Information
9.
Search for the storage system using the Find
for Server, Storage, Power, Networking, and Rack
function in the CMC.
Products, available at http://www.hp.com/support/
10. Log in to the management group (if necessary).
Safety-Compliance-EnterpriseProducts.
11. Log in to the storage system.
Page 6


...

Este manual também é adequado para os modelos :
dados de dispositivos de processamento - HP StoreVirtual 4130 600GB SAS Storage (638.13 kb)
dados de dispositivos de processamento - HP StoreVirtual 4330 1TB MDL China SAS Storage (638.13 kb)
dados de dispositivos de processamento - HP StoreVirtual 4330 1TB MDL SAS Storage (638.13 kb)
dados de dispositivos de processamento - HP StoreVirtual 4330 1TB MDL SAS Storage/S-Buy (638.13 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias