Log:
Assessments - 3, GPA: 4 ( )

Instruções de Operação Kobe Range Hoods, Modelo CH7936SQB

Fabricante : Kobe Range Hoods
Arquivo Tamanho: 5.72 mb
Arquivo Nome :
Língua de Ensino: enesfr
Ir para baixar



por este dispositivo também tem outras instruções :

Facilidade de uso


4) Activating any switch on may cause ignition or an explosion. 5) Due to the size and weight of this hood, installation by 2 persons is recommended. ELECTRICAL SHOCK HAZARD – Can result in serious injury or death. Disconnect appliance from electric power before servicing. If equipped, the fluorescent light bulb contains small amounts of mercury, which must be recycled or disposed of according to Local, State, and Federal Codes. COMPONENTS OF PACKAGE (Must keep all material for returns or refunds) Range Hood Box Duct Cover Box (Sold Separately) {A} KOBE Range Hood – 1 {B} Warranty Registration Card – 1 {C} Instructions Manual – 1 {D} Vent Cover (Top) – 1 {E} Oil Tunnel – 1 {F} Baffle Filters - 2 (30” & 36”) - 3 (42” & 48”) {G} Bottom Casing – 2 {A} {B} {C} {D} {E} {F} {G} {H} Adjustable Duct Cover - 1 {I} Screws Package – 1 {J} Duct Cover-Mounting Bracket – 1 {K} Hood-Mounting Bracket – 1 {H} {I} {J} {K} metalbracket hoodbracket - FOR MORE INFORMATION, PLEASE VISIT OUR WEBSITE OR CONTACT KOBE RANGE HOODS AT (626) 775-8880. INSTALLATION PLEASE READ ENTIRE INSTRUCTIONS BEFORE PROCEEDING Calculation before Installation To calculate installation, please refer to TABLE 1. (All calculation in inches.) - FOR UNDER THE CABINET - TABLE 1 A = Height of Floor to Ceiling B = Height of Floor to Counter Top (Standard: 36") C = Preferred Height of Counter Top to Hood Bottom (Minimum 27" to 30") D = Height of Hood E = Height of the Cabinet tablemeasurement - FOR WALL MOUNT (WITH OPTIONAL DUCT COVER) - TABLE 2 A = Height of Floor to Ceiling B = Height of Floor to Counter Top (Standard: 36") C = Preferred Height of Counter Top to Hood Bottom (Minimum 27" to 30") D = Height of Hood E = Height of Duct Cover [F – D] F = Height of the Hood Installation [A – (B+C)] tablemeasurement2 SAFETY WARNING HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF REMOVING ANY PARTS FOR INSTALLING, CLEANING OR SERVICING. NOTE: BE CAREFUL WHEN USING ELECTRICAL SCREWDRIVER, DAMAGE TO THE HOOD MAY OCCUR. Installation Contents warning symbol UNDER THE CABINET Top Vent………………………………………………………………………………… Rear Vent……………………………………………………………………………….. WALL MOUNT Top Vent………………………………………………………………………………… Rear Vent……………………………………………………………………………….. 7 9 11 14 UNDER THE CABINET INSTALLATION – TOP VENT Preparation before Installation NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING. - Decide the location of the venting pipe from the hood to the outside. Refer to Figure 1. - A straight, short venting run will allow the hood to perform more efficiently. - Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood. - Temporarily wire the hood to test for proper operation before installing. - Peel protective film off the hood (if any). - For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler strips (not included) on each side. Refer to Figure 2. - Measure and create access opening for electrical wires under the cabinet. - Cut the multi duct exhaust according to the size of the venting pipe. Refer to Figure 3. Figure 1 Figure 2 cabinet ductwork-cabinet 6" Round Vent 7" Round Vent 3-1/4" x 10" Vent Figure 3 Hood Installation CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE. 1. Puncture the knockout holes on the hood as shown in Figure 4. 2. If necessary, arrange the electrical wires to run through the 1” diameter hole on the top or the rear of the hood. Refer to Figure 5. 3. Using references on Table 1 and measurements on Page 22 to center the hood in place beneath the cabinet and flush with the front of the cabinet. P4300057 1" Diameter Hole Figure 4 Figure 5 P1010151 4. Draw electrical wires through cabinet access opening. 5. Place screw (not provided) into the exact center of each knockout hole. Make sure all screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING. Ductwork Installation 6. Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. UNDER THE CABINET INSTALLATION – REAR VENT Preparation before installation NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING. - Decide the location of the venting pipe from the hood to the outside. Refer to Figure 6. - A straight, short venting run will allow the hood to perform more efficiently. - Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood. - Temporarily wire the hood to test for proper operation before installing. - Peel protective film off the hood (if any). - For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler strips (not included) on each side. Refer to Figure 7. - Measure and create...

Este manual também é adequado para os modelos :
Fans - CH7930SQB (5.72 mb)
Fans - CH7942SQB (5.72 mb)
Fans - CH7948SQB (5.72 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias