Fabricante : Vulcan-Hart
Arquivo Tamanho: 10.64 mb
Arquivo Nome :
|
Facilidade de uso
1. Remove the grid carriage assembly as outlined in Grid Carriage Assembly. 2. Remove two screws and the lower lever cover from the broiler. – 25 – 3. Remove the two cotter pins and washers from the lower lever arm assembly. 4. Remove the lower lever arm assembly from the two brackets. 5. Reverse the procedure to install. BLOWER AND MOTOR GHIR44 WARNING: SHUT OFF THE GAS BEFORE SERVICING. WARNING: DISCONNECT THE ELECTRICAL POWER TO THE MACHINE AND FOLLOW LOCKOUT / TAGOUT PROCEDURES. 1. Open the lower doors to get access to the blower and motor. 2. Remove the four screws from the bracket and blower and motor. 3. Move the bracket away from the blower and motor. 4. Remove the four screws and nuts from the air duct and the blower and motor. 5. Carefully remove the six screws from the blower and motor and the brackets. 6. Remove the air duct from the broiler. 7. Note the location and connection of the electrical wires. – 26 – 8. Disconnect the electrical wires. 9. Remove the blower and motor from the broiler. 10. Reverse the procedure to install. IR1 and IR2(B) WARNING: DISCONNECT THE ELECTRICAL POWER TO THE MACHINE AND FOLLOW LOCKOUT / TAGOUT PROCEDURES. WARNING: SHUT OFF THE GAS BEFORE SERVICING. 1. Remove the screws and the bracket and the blower and motor. 2. Remove the screws and nuts from the air duct and the blower and motor. 3. Carefully remove the screws from the blower and motor and the brackets. 4. Carefully remove the air duct from the blower and motor. 5. Note the location and connection of the electrical wires. 6. Disconnect the electrical wires from the blower and motor. 7. Remove the blower and motor from the broiler. 8. Reverse the procedure to install. Blower Switch (GHIR44) WARNING: DISCONNECT THE ELECTRICAL POWER TO THE MACHINE AND FOLLOW LOCKOUT / TAGOUT PROCEDURES. WARNING: SHUT OFF THE GAS BEFORE SERVICING. 1. Remove the manifold cover assembly as outlined in Covers, Panels and Handles. 2. Remove the nut from the manifold cover assembly and the switch. 3. Note the location and connection of the electrical wires. 4.Disconnect the electrical wires. 5. Reverse the procedures to install. – 27 – Light (GHIR44) WARNING: DISCONNECT THE ELECTRICAL POWER TO THE MACHINE AND FOLLOW LOCKOUT / TAGOUT PROCEDURES. WARNING: SHUT OFF THE GAS BEFORE SERVICING. 1. Remove the manifold cover assembly as outlined in Covers, Panels and Handles. 2. Note the location and connection of the electrical wires. 3. Disconnect the electrical wires from the light. 4. Reverse the procedure to install. SERVICE PROCEDURES AND ADJUSTMENTS GAS SUPPLY CHECKS If the gas supply piping is to be tested at a test pressure in excess of 1/2 psi (3.45 kPa), the appliance and its individual shutoff valve must be disconnected from the supply line. If the gas supply piping is to be tested at a pressure equal to or less than 1/2 psi (3.45 kPa), the individual shutoff valve must be closed during testing. REGULATOR ADJUSTMENT 3. Light all burners and take a reading. (ALL MODELS) 4...
Este manual também é adequado para os modelos :Aquecedores de Água - GHCB40 (10.64 mb)
Aquecedores de Água - GHCB44 (10.64 mb)
Aquecedores de Água - GHIR44 (10.64 mb)
Aquecedores de Água - GHMCB44 (10.64 mb)