Log:
Assessments - 4, GPA: 4 ( )

Instruções de Operação Weil-McLain, Modelo CGM (Series 10)

Fabricante : Weil-McLain
Arquivo Tamanho: 1.88 mb
Arquivo Nome : 0d62e2c3-64c8-7c54-2ddf-6b03f3d6db5b.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


550-141-324/1283WP TABLE OF CONTENTS f 'v Section I: Installation *«• Pag« Explanation of Terms........ ...................... 3 By-Pass Piping—Low Water Temperature Applications. .. 8 Air Supply For Combustion .... ...................... 3 External Heat Exchangers . .................... .. 8 Select Boiler Location....... ....,................. 4 Additional High Temperature Limit................. .. 8 Clearances................ ...................... 4 Freeze Protection.... ......................... 8 Chimney or Vent Requirements ...................... 4 With Refrigeration Systems ...................... .. 8 BoHer Foundation........... ...................... 4 Draft Diverter Installation ........................ .. 9 Residential Garage Installations ...................... 5 Breeching Erection............................. 9 Locating the Boiler.......... ...................... 3 Gas Piping.................................... 9-10 Orifice Drilling Size.......... ...................... 5 . 10 Hydrostatic Pressure Test — ...................... 5 Multiple Zoning—Wiring........................ 10 Piping..................... ....................5-7 Room Thermostat.............................. . 10 Expansion Tanks ........... ...................... 6 Check Out Sequence .......................... 11 Piping—Multiple Zoning...... ...................... 6 Measure Gas Input ............................. . 11 Filling the System........... ...................... 6 Installation and Service Certificate................. . 11 Section II: Maintenance, Basic Troubleshooting Paga Paga Suggested Minimum Maintenance Schedule ...........12 Inspect Venting System ......................... .. 14 To Place in Operation........ ......................13 Clean Boiler Heating Surfaces.................... . 14 Inspecting Base Insulation____ ......................13 Cleaning Main Burners .......................... ...14 Check Main Burner Flames ... ......................13 Annual Shut-Down Procedure..................... ...14 Check Pilot Burner Flames____ ......................14 Common Problems and Possible Solutions .......... ...15 Section III: Replacement Parts Pag* Component Replacements____ ...................16-17 Section IV: Ratings, Dimensions Pag« h«« Ratings-Dimensions............................. 18 Standard Equipment...............................19 Engineering Data ............................... 19 IMPORTANT: When calling or writing about the boiler, Any reuse or reproduction of the artwork and copy in PLEASE GIVE THE MODEL, SERIES, AND C.P. NUM- this manual is strictly prohibited without the written BERS located on the boiler rating nameplate. consent of Well-McLaln. © UJEII-milAIN Michigan City, Indiana 46360 ■ A Marley Company ran m Canada Wyljm Canada LTD . ITEE . 126 Easl Dt. Bwnpton. Onl«r«oL6T 1C? Section I: Installation The following terms are used throughout this manual to bring attention to the presence of hazards of various risk levels, or to important information concerning the life of the product. An explanation of each term is given below: DANGER Danger is used to indicate the presence of a hazard which will cause severe personal injury, death or substantial property damage if the warning is ignored. CAUTION Caution is used to indicate the presence of a hazard which will or can cause minor personal injury or property damage if the warning is ignored. WARNING Warning is used to indicate the presence of a hazard which can cause severe personal injury, death or substantial property damage if the warning is ignored. NOTICE Notice is used to notify of special instructions on installation, operation or maintenance which are important but not related to personal injury hazards. READ ALL INSTRUCTIONS BEFORE STARTING FAILURE TO COMPLY WITH INSTALLATION INSTRUCTIONS CAN VOID WARRANTY Installations must comply with all local codes, laws, regulations and ordinances. Also United States National Fuel Gas Code ANSI Z223.1-1980, obtain from: American Gas Association, 1515 Wilson Boulevard, Arlington (Rosslyn), Virginia 22209. When required, the installation must conform to American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers, No. CSD-1. Safe lighting and other performance criteria were met with the gas manifold and control assembly provided on the boiler when the boiler underwent tests specified in the ANSI Z223.1-1980 standard. In Canada the installation must comply with National Standard of Canada CAN 1-B149.1 or .2, Installation Code for Natural Gas Burning Appliances. The installation is exempt from compliance with clauses 6.13.1 and 6.13.5 of CAN 1-B149.1. Clause 6.14.3 of CAN 1B149.1 is supplemented by the following subsection: (c) or in accordance with the manufacturer’s certified instructions. Refer to "Supplemental Instructions— CGM and P-CG Boilers for Canada” for application details. ...


Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias