Log:
Downloads : 8   Arquivo Tamanho: 217 kb   Fabricante : Chamberlain  
Categoria : carregadores
@name

Refer to the manual for all mounting and wiring instructions with the exception of page 14. For page 14, follow instructions shown below. WIRING CONTROL WIRING BATTERY BACKUP If the gate operator is already factory equipped with battery run, only the Right/Left Side switch and Mode 1 are supported (Figure 3). The Right/Left switch must to be set in the same position as the Right/Left switch on the main control board. (See page 22 for correctly setting the Right/Left switch on the control bo





categorias