|
Facilidade de uso
2828272628272627302729211920223027292122302729192018172615161718 Figure “D” - Assembly Model ERXL-100, ERXL-125S Figure “E” - Assembly Model ERXL-125, ERXL-150, ERXL-175 Figure “F” - Assembly Model ERXL-150L, 175L SECTION 3 Installation & Assembly FIGURE 2: Ener-Radiant XL Overview Key Burner Housing Must always be installed horizontally. Tube and Reflector Hanger Install immediately after first coupling. Tube and Reflector Hanger Suspend system from these hangers. Minimum two (2) required per tube. Reflectors Alternate overlap as shown on overview. Length of reflector and amount of overlap is indicated. Heat Exchange Tubes Supplied in 10 ft. lengths. 10' 2=1/2" ALUMINIZED Tube Coupling Assembly Coupling should be oriented with slide bar on top, and all couplings should “point” in the same direction. Turbulator Assembly Enerco normally ships Ener-Radiant heaters with turbulators assembled into appropriate tubes. Where Field Changes Occur Turbulator Sections and Adapter are available in sections and must be assembled before installation (See Figure 7 for details). The number of sections required is indicated. Suspensions Point Use S-Hooks (See Figure 5) for suspension details. Vent Adapter Used to attach the heat exchanger tubing to vent pipe. Figure 2a: Ener-Radiant XL Model ERXL-60, ERXL-80S, Assembly Overview 20 ft. Exchanger length. 21 ft. - 4 in. Total Heater length. 4 Suspensin points indicated. HANGERHANGERHANGERHANGER18”18” 18”18”18”18”18”18” 18”18” 10’ 2-1/2”10’ 2-1/2” 10’ 2-1/2”10’ 2-1/2”10’ 2-1/2” 2-1/2” OVERLAY TYPALUMINIZED(4) Turbulator Sections(1) Turbulator Adapter(4) Turbulator Sections(1) Turbulator AdapterALUMINIZEDALUMINIZEDALUMINIZED FIGURE 2b: Ener-Radiant XL Model ERXL-80, Assembly Overview 30 ft. Exchanger length. 31 ft. - 4 in. Total Heater length. 6 Suspension points as indicated FIGURE 2c: Ener-Radiant XL Model ERXL-100S Assembly Overview 30 ft. Exchanger length. 31 ft. - 4 in. Total Heater length. 6 Suspension points as indicated. 18”18”18”18”18”18” 10’ 2-1/2”10’ 2-1/2”10’ 2-1/2” (2) Turbulator Sections(1) Turbulator AdapterHANGERTyp. HANGERHANGERHANGERALUMINIZEDALUMINIZEDALUMINIZEDALUMINIZED18” Typ. 18” Typ. 18” Typ. ALUMINIZEDALUMINIZEDALUMINIZEDALUMINIZED FIGURE 2d: Ener-Radiant XL Model ERXL-100, ERXL-125S 40 ft. Exchanger length. 41 ft. - 4 in. Total Heater length. 8 Suspension points as indicated. FIGURE 2e: Ener-Radiant XL Model ERXL-125, ERXL-150, ERXL-175 50 ft. Exchanger length. 51 ft. - 4 in. Total Heater length. 10 Suspension points as indicated. FIGURE 2f: Ener-Radiant XL Model ERXL-150L, ERXL-175L 60 ft. Exchanger length. 61 ft. - 4 in. Total Heater length. 12 Suspension points as indicated. Assemble the heater components as shown in Figures 2a, 2b, 2c, 2d, 2e, and 2f. Optional reflector configurations are shown in (Figure 1). Install appropriated suspension hardware, beam clamps, chain or rod at predetermined locations. Adjustment of chain length will provide uniform pitch. Couplings: Tube and tube fittings are connected by wrap-around couplings which clamp by means of a tapered, hammer-driven lock member. The starting ends of the coupling and lock member are identified by 1/4” holes which are put together when starting assembly. Be sure the tube ends are in line and tube ends butt against stop pin(s) inside coupling. The slide bar is to be hammer-driven to a point of securing the coupling snugly to the tubes. Over-driving will result in distortion of the coupling or slide bar lip to a point decreasing the holding the capability of the coupling. Coupling should be tight when the slide bar is +- 2” from the end of the coupling. (See Figure 3) TURBULATOR BAFFLE ASSEMBLY INSTRUCTIONS For ease of field installation, the turbulator should be installed in the tube before hanging the system. Use the following procedure: 1) Assemble turbulator pieces by “twisting” matching ends together. 2) Insert a long wire (11 ft. minimum) down the length of the tube. 3) Attach the wire to the hole in the tab on the adapter piece. 4) Using the wire, pull the assembled turbulator into the tube from the opposite side. 5) Pull the turbulator through until just the tab comes out. Detach the wire. 6) Bend the tab around the tubing. When installing the tube, the tab will be locked in place by the adapter. FIGURE 4: Installation of Elbow & Coupling (optional equipment) Elbow Package: Stk. # F106415 Elbow Package includes: (1) elbow, (1) coupling and (1) refelctor. Install elbow into radiant tube sequence where plans indicate a 90° bend (see Figure 4). Stk. # F106414 U-Tube Package includes: (1) U-tube, (1) coupling and (2) reflectors. Install U-tube elbow into radiant tube sequence where plans indicate a 180° bend (see Figure 4). FIGURE 3: Coupling Assembly Orient coupling so th...
Este manual também é adequado para os modelos :Aquecedores a gás - ERXL-100 (1.11 mb)
Aquecedores a gás - ERXL-100S (1.11 mb)
Aquecedores a gás - ERXL-125 (1.11 mb)
Aquecedores a gás - ERXL-125S (1.11 mb)