Log:
Assessments - 2, GPA: 5 ( )

Instruções de Operação Gas-Fired Products, Modelo 3107

Fabricante : Gas-Fired Products
Arquivo Tamanho: 368.47 kb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Option 1 - Vents to Adjoining Rooms Option 3 - Vents to Adjoining Room Option 2 - Remove Door to Adjoining Room VO370-2 Fig. 5 Supplementing ventilation air. Wall 10” 12” 8” 6” 4” 2” 10” 8” 6” 4” 2” 1” Wall 10” 12” 8” 6” 4” 2” 10” 8” 6” 4” 2” 1” Vermont Castings Jefferson Vent Free Gas Heater Clearance Requirements Hearth Requirements Minimum Clearances to Combustible Materials The JUVS must be installed on rigid flooring. If the appliance is installed on any combustible surface other than wood flooring, such as carpet or tile, a metal or wood panel must be installed to extend the full length Maintain clearance, (empty space), between combus and width of the unit. tible materials and the heater as specified. Alcove Clearances ST103 B C DB A A: Ceiling .................. 27Z\x” C: Rear Wall ................... 4” B: Side Wall .............. 4” D: Max. Alcove Depth ..... 48” WARNING • • • • Do not install this heater in a bathroom or bedroom. Installation of this heater must conform with Local Codes or in the absence of Local Codes, with the National Fuel Gas Code, ANSI Z223.1. This heater creates warm air currents. These currents move heat to wall surfaces next to the heater. Installing the heater next to vinyl or cloth wall coverings or operating the heater where impurities in the air such as tobacco smoke exist, may discolor walls. Do not use a blower insert, heat exchanger insert or other accessory not approved with this heater. Fig. 6 Minimum wall clearances. Mantel Clearance 12” 1” Stove FP599b Fig. 7 Mantel clearance at 45°. NOTE: Mantel clearances will apply to an alcove installation. Vermont Castings Jefferson Vent Free Gas Heater Optional Fan Kit Installation (2960/FK28) Assembly Procedures 1. Attach the fan to the rear shroud by engaging the upper flange of the fan skirt under the lower edge of the shroud and secure the skirt with the four screws and one star washer provided. (Fig. 8, 9 ) ST241 Fig. 9 Correct position of fan skirt installation. Upper Flange To Control Valve ST240 Fig. 8 Place upper flange behind lower edge of shroud. Star Washer 2. Disconnect the snapstat module from the leads inside the snapstat bracket. (Fig. 10) 3. Bend open the snapstat bracket. use your fingers or needle nose pliers to remove the black plastic grommet from the bracket. Discard the grommet and bracket. 4. Secure the snapstat to the upper middle of the inner shroud. (Fig. 11) NOTE: The snapstat location may be reached through the front of the stove between the top and the firebox or you may loosen the four screws holding the rear shroud in place. Be sure to secure shroud back into place before operation. 5. Connect the two wires to the two snapstat extension leads attached to the inner shroud. You may coil excess wire up inside the rear shroud. 6. Route the rheostat control switch and wire forward under the stove. (Fig. 12) Use the wire tie to secure the fan and rheostat wire harnesses together to the tubing under the heater. Pinch Grommet to Remove S...

Este manual também é adequado para os modelos :
Eléctrico - 3105 (368.47 kb)
Eléctrico - 3095 (368.47 kb)
Eléctrico - 3096 (368.47 kb)
Eléctrico - 3095 (368.47 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias