Log:
Assessments - 3, GPA: 4 ( )

Instruções de Operação American Standard, Modelo SELECTRONIC 7095.121

Fabricante : American Standard
Arquivo Tamanho: 1.01 mb
Arquivo Nome :
Língua de Ensino:
Ir para baixar



Facilidade de uso


Fig. 8b. 7 ADJUST SUPPLY STOP; Fig. 9 IMPORTANT: To avoid overflowing, the SUPPLY STOP (3) must never be opened to the point where the flow from the valve exceeds the flow capacity of the fixture.The fixture must be able to handle a continuous flow in case of a flush valve failure. 1. After installation is complete, peel off the PROTECTIVE FILM (1) from the sensor. Standing to one side, block the sensor with your hand for 10 seconds. Remove your hand and listen for audible “click” from within the valve. 7 9 6 2 5 8 10 121mm,+13mm, -6mm (4-3/4)(+1/2, -1/4)Fig. 8b 2. Remove COVER (2) from SUPPLY STOP (3).Turn on water supply 1/4 turn to 1/2 turn(CCW) and test for leaks. Note: Unit may flush for approximately 5 to 10 sec. when water is first turned on. If flow persists, turn water off and repeat step #1 above. 3. Actuate the FLUSH VALVE: A) Cover sensor with hand for 10 seconds. NOTE: Stand outside of sensor detection aera. B) Remove hand from in front of the sensor; unit will flush in approximately 3 seconds. 4. Adjust SUPPLY STOP (3) after each flush until the stated flush volume is achieved, no splashing occurs and the fixture is properly cleansed. 5. When adjustment is complete, replace COVER (2) and tighten to ensure vandal-resistance. M968699 Rev. 1.14 1Fig. 9 2 REMOVE COVER CLOCKWISE CLOSES CONTROL STOP COUNTER-CLOCKWISE OPENS CONTROL STOP 3 5 Fig. 12b M968699 Rev. 1.14 9 6 1. Remove COVER (1) from SUPPLY STOP (2) if installed. Fig. 10. 2. Turn water supply off. Fig. 10. 3. Loosen SPUD COUPLING NUT (3). Unthread COUPLING NUT (4) and VACUUM BREAKER COUPLING NUT (5). Remove FLUSH VALVE (6). Fig. 10. 4. Clean all threaded connections before installing the new flush valve. Fig. 10a. 5. Refer to Sections 5,6 and 7 to complete the retrofit installation. Fig. 10b. Note: In most Retrofits the wall escutcheon, supply stop, cover tube and vacuum breaker do not have to be replaced. If these items do need replacement they must be purchased separately or order the complete flush valve assembly from American Standard. HOW TO RETROFIT OUR VALVE; Fig. 10 8 (Replaces Industry Standard Manual and Electronic Valves) CLEAN CONNECTIONS 2 Fig. 10 Fig. 10a Fig. 10b 1 4 5 3 6 1. Loosen SET SCREW (1) with 2.5mm Hex Wrench (2) in back of top half of FLUSH VALVE CAP (3). Fig. 12a. 2. Rotate CAP (3) to the right and pull off. Fig. 12b. 3. Turn CAP (3) over and remove the two SCREWS (4). Remove the BATTERY COVER (5) to expose the battery (6). Remove old BATTERY (6). Fig. 12c. 4. Install the new BATTERY (7) making sure the + & - are facing up towards the open end of the cover. Fig. 12d. 5. Replace the BATTERY COVER (5), reverse the above steps to assembly flush valve. HOW TO CHANGE THE BATTERY; Fig. 12 1 7 5 4 6 6 Fig. 12a Fig. 12c Fig. 12d Fig. 12 OLD BATTERY OUT NEW BATTERY IN 2 3 7 M968699 Rev. 1.14 Note: The detection distance is preset and is ideal for most installations. Sho...

Este manual também é adequado para os modelos :
Canalização - SELECTRONIC 6065.121 (1.01 mb)
Canalização - SELECTRONIC 6065.122 (1.01 mb)
Canalização - SELECTRONIC 6065.122 (1.01 mb)
Canalização - SELECTRONIC 6065.121 (1.01 mb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias