Log:
Assessments - 3, GPA: 4 ( )

Instruções de Operação Napoleon Fireplaces, Modelo VF5000-CMN-2

Fabricante : Napoleon Fireplaces
Arquivo Tamanho: 1006.8 kb
Arquivo Nome : Lennox_Superior_VF-5000_VF-6000_Installation_Operation_903302.pdf
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Step 2. Plumb gas line. (Gas connections should only be performed by an experienced, licensed/ certified tradesman.) Step 3. Assemble logs and test flame appearance. Step 4. Complete finish wall material, surround and optional hearth extension to your individual taste. Note:Framing dimensions in Figures 4 - 9 are calculated for a nailing flange depth of..." (13 mm). Note:Framing dimensions in Figures 4 - 9 are calculated for a nailing flange depth of..." (13 mm). Back Wall of Chase/Enclosure Chase/Enclosure Including Finishing Including Finishing Figure 4 Figure 7 Back Wall of Back Wall of Chase/Enclosure Chase/Enclosure Figure 8 Figure 5 VF6000 VF5000 Figure 6 Figure 9 The header may be in direct contact with the top metal spacers, but must not rest on them or be notched to fit around them. NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. 37" (940mm) 15 1/2" (394mm) Outside Wall VF5000 Materials If Any. Materials If Any. 41" (1041mm) 19 1/2" (495mm) Outside Wall VF6000 37" (940mm) 58" (1473mm) 13 1/2" (343mm) 29" (737mm) 41" (1041mm) VF5000 Including FinishingMaterials If Any. 41" (1041mm) 67 3/4" (1721mm) 14 1/4" (362mm) 33 7/8" (860mm) 47 7/8" (1216mm) Including FinishingMaterials If Any. VF6000 37 1/4" (946 mm) 37" (940 mm) 15 1/2" (394 mm) 42 3/8" (1076 mm) 41" (1041 mm) 19 1/2" (495 mm) INSTALLATION STEPS Built-In Systems WARNING: DO NOT ALLOW FANS TO BLOW DIRECTLY INTO THE FIREPLACE. AVOID ANY DRAFTS THAT ALTER BURNER FLAME PATTERNS. WARNING: DO NOT USE A BLOWER IN- SERT, HEAT EXCHANGER INSERT OR OTHER ACCESSORY NOT APPROVED FOR USE WITH THIS HEATER. Do not burn solid fuels in this listed unvented gas room heater. Step 1. Frame VF5000 appliance enclosures as illustrated in Figures 4, 5 and 6. Frame VF6000 appliance enclousures as illustrated in Figures 7, 8 and 9 for surround installations proceed to Step 8. Note:The framed depth (15-1/2" for a flat wall, 29-1/4" for a corner VF5000 and 22-5/8" and 36-3/8" for a VF6000 ) must always be measured from a finished surface. If a wall covering such as drywall is to be attached to the rear wall, then the dimension must be measured from the drywall surface. Step 2. Route a 1/2" (13 mm) gas line along the left or right side framing (Figure 10). 3" (76 mm) VF6000 - 11" (279 mm) VF5000 - 7 1/2" (191 mm) Figure 10 All appliances have a 3" long 3/8" NPT nipple installed at the valve. To quickly and easily complete the gas line routing, use the gas flex line kit, Model GFLV. NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. Figure 11 Control Valve Lower Control Compartment Door Step 3. Ensure the hood is properly positioned in the open area above the appliance door. If required insert the tabs, on each end of the hood, into the bracket at each end. Bend the two tabs over to secure. Step 4. Position appliance into prepared framing, secure with 6d nails or equivalent at the nailing flange along each side. Step 5. Connecting Gas Line – Make gas line connections. All codes require a shut-off valve mounted in the supply line. Figure 11 illus- trates two metho...

Este manual também é adequado para os modelos :
Lareiras - VF5000-CMP-2 (1006.8 kb)
Lareiras - VF5000-CMN-2 (1006.8 kb)
Lareiras - VF5000-CMN-2 (1006.8 kb)
Lareiras - VF5000-CMN-2 (1006.8 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias