Log:
Assessments - 1, GPA: 5 ( )

Instruções de Operação Napoleon Fireplaces, Modelo VF6000-CMP-2

Fabricante : Napoleon Fireplaces
Arquivo Tamanho: 1006.8 kb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


Figure 11 illus- trates two methods for connecting the gas supply. Installation methods and materials must be in compliance with local codes. The gas control valve is located in the lower control compartment. To access the valve open the lower control compartment door (Figure 12). The control valve has a 3/8" NPT thread inlet port and is fitted with a 3" (76 mm) long nipple, 3/8" NPT on both ends. Plan the connections accordingly. We recom- mend that the gas line be routed for the left side of the appliance to ensure adequate ac- cess to the rear lower compartment for instal- lation and servicing of the optional FAB-1100 blower. Secure all joints tightly using appropriate tools and sealing compounds (ensure pro- pane resistant compounds are used in pro- pane applications). Turn on gas supply and test for gas leaks, using a gas leak test solution (also referred to as bubble leak solution). Note: Using a soapy water solution (50% dish soap, 50% water) is an effective leak test solution but it is not recommended, because the soap residue that is left on the pipes/ fittings can result in corrosion over time. Never use an open flame to check for leaks. A. Light the appliance (refer to safety and lighting instructions on pages 18 and 19) (See *Note). Figure 12 Gas Stub 1/2" x 3/8" FlareShut-Off Valve 3/8" Flex Tubing 3/8" NPT x 3/8" Flare Fitting 3/8" Nipple, Standardwith all Units 3/8" Union 3/8" Close Nipple 3/8" Shut-Off Valve 1/2" x 3/8" Reducer Gas Valve Gas Flex Line Kit, Model GFLV NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. Figure 11 Control Valve Lower Control Compartment Door Step 3. Ensure the hood is properly positioned in the open area above the appliance door. If required insert the tabs, on each end of the hood, into the bracket at each end. Bend the two tabs over to secure. Step 4. Position appliance into prepared framing, secure with 6d nails or equivalent at the nailing flange along each side. Step 5. Connecting Gas Line – Make gas line connections. All codes require a shut-off valve mounted in the supply line. Figure 11 illus- trates two methods for connecting the gas supply. Installation methods and materials must be in compliance with local codes. The gas control valve is located in the lower control compartment. To access the valve open the lower control compartment door (Figure 12). The control valve has a 3/8" NPT thread inlet port and is fitted with a 3" (76 mm) long nipple, 3/8" NPT on both ends. Plan the connections accordingly. We recom- mend that the gas line be routed for the left side of the appliance to ensure adequate ac- cess to the rear lower compartment for instal- lation and servicing of the optional FAB-1100 blower. Secure all joints tightly using appropriate tools and sealing compounds (ensure pro- pane resistant compounds are used in pro- pane applications). Turn on gas supply and test for gas leaks, using a gas leak test solution (also referred to as bubble leak solution). Note: Using a soapy water solution (50% dish soap, 50% water) is an effective le...

Este manual também é adequado para os modelos :
Lareiras - VF5000-CMP-2 (1006.8 kb)
Lareiras - VF5000-CMN-2 (1006.8 kb)
Lareiras - VF5000-CMN-2 (1006.8 kb)
Lareiras - VF5000-CMN-2 (1006.8 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias