Log:
Assessments - 1, GPA: 3 ( )

Instruções de Operação Napoleon Fireplaces, Modelo VF6000-CMN-2

Fabricante : Napoleon Fireplaces
Arquivo Tamanho: 1006.8 kb
Arquivo Nome :
Língua de Ensino: en
Ir para baixar



Facilidade de uso


wire. * For Rocker or ON/OFF Wall Switch Attachment Only. * * From Thermocouple VF5000/VF6000 SeriesOptional Wiring Diagram TPTH TP THThermopile If any of the original wire as supplied must be replaced, it must be replaced with Type AWM 105°C – 18 GA. wire. Optional ON/OFFWall Switch/Rocker Switch Factory Wired Field Wired * * For Rocker Switch Attachment Only. * From Thermocouple Figure 13 Figure 14 NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE.8 Figure 15 White (Supply) Black (Supply) BipolarTerminal Screw Blower (Lower) Outlet Black Wire MatingConnectors Red Wire 120 Vac 60 Hz Blower Wiring Diagram } OFF/ON BlowerWall Switch To Fuse or Circuit Breaker 120V AC 60Hz FireplaceJunction Box Black White Receptacle Ground Wire Connection Note: Supply wires may be alternatively connected to the outlet using the screw terminals, however the black supply wire must be ganged wired to the same terminal that the pre-wired black wire is attached to and the white supply wire must be connected to the opposite side of the outlet. VF5000/VF6000 SeriesStandard Wiring Diagram TPTH TP THThermopile If any of the original wire as supplied must be replaced, it must be replaced with Type AWM 105°C – 18 GA. wire. * For Rocker or ON/OFF Wall Switch Attachment Only. * * From Thermocouple VF5000/VF6000 SeriesOptional Wiring Diagram TPTH TP THThermopile If any of the original wire as supplied must be replaced, it must be replaced with Type AWM 105°C – 18 GA. wire. Optional ON/OFFWall Switch/Rocker Switch Factory Wired Field Wired * * For Rocker Switch Attachment Only. * From Thermocouple Figure 13 Figure 14 The forced air blower kit may be mounted at initial appliance installation or at any time thereafter. Follow the instructions provided with the blower kit. Finished Wall Details It is sometimes best to frame the appliance after it has been positioned in place. Frame with 2 x 4s or heavier lumber. Always frame in accordance with local building codes. Note:The header may rest on the top spacers but must not be notched to fit around them. In order to install the appliance facing flush with the finished wall, position the framework to accommodate the thickness of the finished wall (Refer to Figures 2 and 3). If you live in a cold climate, seal all cracks around your appliance with noncombustible material and wherever cold air could enter the room. It is especially important to insulate outside chase cavity between studs and under floor on which appliance rests, if floor is above ground level. Proceed to Step 12. Surround Installations Note: The VF5000/VF6000 series appliances must be installed giving full consideration to the clearance and height requirements identified in this manual. Figure 16 Step 8. Position Heater – Place the heater in desired location. It may be helpful to temporarily assemble the surround around the appliance to properly locate the unit. Refer to Figure 16 for floor and platform installations. If the heater is to be installed into a framed wall refer to the built-in assembly steps beginning on...

Este manual também é adequado para os modelos :
Lareiras - VF5000-CMP-2 (1006.8 kb)
Lareiras - VF5000-CMN-2 (1006.8 kb)
Lareiras - VF5000-CMN-2 (1006.8 kb)
Lareiras - VF5000-CMN-2 (1006.8 kb)

Escreva a sua própria avaliação do dispositivo



Mensagem
Seu nome :
Introduza os dois dígitos :
capcha





categorias